blazr
Hall of Famer
Posts: 12,989
Joined: Nov 2003
Reputation: 276
I Root For: UAB
Location: Nashville, TN
|
Stadiums first big concrete pour is happening now
(07-31-2020 04:30 PM)WesternBlazer Wrote: (07-31-2020 03:26 PM)blazr Wrote: Was looking at renderings...we’ll have the “Jumbotron” in South endzone but don’t anything in north end. It would serve the purpose but look strange to just toss up a generic LED board. We have to have something teams can see on each end, right? (in addition to the field-level play clocks)
Sent from my iPhone using Tapatalk
May not want people at the Westin or at the upper level of Uptown to watch a free game or folks on the highway to be distracted...
I didn’t think about the last part. In all seriousness, I wonder if there is a regulation on something that’s essentially going to be eye level with cars merging from Red Mtn Expressway as well as those on the interstate. Probably far enough away that it doesn’t matter unless we were putting up a 2nd, billboard-sized jumbotron.
Still have to have something there unless Clark is going to defer every half so we face the only scoreboard on the field (secret home field advantage inspired by a former Blazer HC)
Sent from my iPhone using Tapatalk
(This post was last modified: 07-31-2020 05:21 PM by blazr.)
|
|
07-31-2020 05:19 PM |
|
HiddenDragon
Banned
Posts: 15,979
Joined: May 2004
I Root For:
Location:
|
RE: Stadiums first big concrete pour is happening now
(07-31-2020 05:19 PM)blazr Wrote: (07-31-2020 04:30 PM)WesternBlazer Wrote: (07-31-2020 03:26 PM)blazr Wrote: Was looking at renderings...we’ll have the “Jumbotron” in South endzone but don’t anything in north end. It would serve the purpose but look strange to just toss up a generic LED board. We have to have something teams can see on each end, right? (in addition to the field-level play clocks)
Sent from my iPhone using Tapatalk
May not want people at the Westin or at the upper level of Uptown to watch a free game or folks on the highway to be distracted...
I didn’t think about the last part. In all seriousness, I wonder if there is a regulation on something that’s essentially going to be eye level with cars merging from Red Mtn Expressway as well as those on the interstate. Probably far enough away that it doesn’t matter unless we were putting up a 2nd, billboard-sized jumbotron.
Still have to have something there unless Clark is going to defer every half so we face the only scoreboard on the field (secret home field advantage inspired by a former Blazer HC)
Sent from my iPhone using Tapatalk
I think with the way they built the "new Malfunction Bridges" the only spot you may would be able to see into the stadium is when you're taking the 20/59 exit to Tuscaloosa from Hwy 280 and even then I think the barriers are high enough to where you can't look over it.
|
|
07-31-2020 05:30 PM |
|
Plaid Blazer
Bench Warmer
Posts: 192
Joined: Mar 2020
Reputation: 1
I Root For: UAB
Location:
|
RE: Stadiums first big concrete pour is happening now
(07-31-2020 03:26 PM)blazr Wrote: Was looking at renderings...we’ll have the “Jumbotron” in South endzone but don’t anything in north end. It would serve the purpose but look strange to just toss up a generic LED board. We have to have something teams can see on each end, right? (in addition to the field-level play clocks)
Sent from my iPhone using Tapatalk
I don't know if there is an NCAA mandate for scoreboards on each end. I think there would be. Many stadiums have a Jumbotron on one end and a small scoreboard on the other. Many times its the previous scoreboard from 20 years ago. Will be interesting to see how Protective Stadium handles that.
On a side note, I expect us to get some cool green and gold LED lighting with a brand new stadium.
|
|
07-31-2020 09:25 PM |
|
blazinrunner
All American
Posts: 3,055
Joined: Feb 2005
Reputation: 19
I Root For: UAB & Marlins
Location: North Alabama
|
RE: Stadiums first big concrete pour is happening now
A few years back, Uptown showed football/basketball games on the jumbo screen on the rooftop. The UAB-Iowa State NCAA hoops game was shown on it. It was a really cool place to watch games. ALDOT made them quit since it was facing the interstate ramps.
|
|
08-01-2020 12:21 PM |
|
HiddenDragon
Banned
Posts: 15,979
Joined: May 2004
I Root For:
Location:
|
RE: Stadiums first big concrete pour is happening now
(08-01-2020 12:21 PM)blazinrunner Wrote: A few years back, Uptown showed football/basketball games on the jumbo screen on the rooftop. The UAB-Iowa State NCAA hoops game was shown on it. It was a really cool place to watch games. ALDOT made them quit since it was facing the interstate ramps.
And honestly it was a good move. Knowing Alabamians, they would have:
A. Pulled over to the side on the ramp to watch the game.
B. Slow down to watch causing a rear end accident.
C. Both A & B.
(This post was last modified: 08-03-2020 12:17 PM by HiddenDragon.)
|
|
08-01-2020 12:30 PM |
|
mixduptransistor
Hall of Famer
Posts: 10,987
Joined: Dec 2006
Reputation: 79
I Root For: UAB
Location: Atlanta
|
RE: Stadiums first big concrete pour is happening now
I'm curious what jurisdiction anyone thinks ALDOT has regarding things not on their property. If they can't get a guy on I-65 to take down his giant confederate flag, who thinks they can get someone to take down a scoreboard inside a stadium?
|
|
08-01-2020 01:10 PM |
|
blazr
Hall of Famer
Posts: 12,989
Joined: Nov 2003
Reputation: 276
I Root For: UAB
Location: Nashville, TN
|
RE: Stadiums first big concrete pour is happening now
(08-01-2020 12:04 PM)ATTALLABLAZE Wrote: If there is only one scoreboard I’m not going. There are just some things I cannot compromise on.
I stand with you.
|
|
08-01-2020 01:31 PM |
|
blazr
Hall of Famer
Posts: 12,989
Joined: Nov 2003
Reputation: 276
I Root For: UAB
Location: Nashville, TN
|
RE: Stadiums first big concrete pour is happening now
(08-01-2020 01:10 PM)mixduptransistor Wrote: I'm curious what jurisdiction anyone thinks ALDOT has regarding things not on their property. If they can't get a guy on I-65 to take down his giant confederate flag, who thinks they can get someone to take down a scoreboard inside a stadium?
They regulate billboards. They regulate signage...both on the interstates and for private businesses within view. IF the top of the north end of the stadium is in view of the interstate and/or state highway, they can regulate it. Attalla can correct me since he's done this sort of work before, but I imagine the engineers had to clear the lighting at the stadium if it is within a certain distance of a public road. Especially a major highway, an interstate, and the junction between the two. If we wanted to put 2 huge spotlights on top of the stadium pointed at the road I have a feeling that idea would get quashed by ALDOT before or immediately after they went up.
They forced a change of some kind right after the digital billboard went up on I-65N at Oxmoor. No idea at this point what year that went up and what the issue was. Old age is unforgiving.
As for the confederate flag, I guess there's a difference between can regulate and how much effort they put into actually regulating it.
(This post was last modified: 08-01-2020 01:47 PM by blazr.)
|
|
08-01-2020 01:45 PM |
|
BlazinBham
Banned
Posts: 3,762
Joined: Nov 2017
I Root For: UAB
Location:
|
RE: Stadiums first big concrete pour is happening now
In regards to the stadium being finished on time for game 1.
Maybe when they are questioning that, they are referring to cosmetic stuff and not to whether or not the stadium would be functional?
Do I care if flowers are planted or a water fountain is running? With concession stands, we can find ways to get vendors in the stadium to provide food and beverage options temporarily if concessions aren’t ready.
Would be a shame if stadium isn’t functional for game 1 or 3, whichever week we add that 6th home game.
(This post was last modified: 08-01-2020 06:45 PM by BlazinBham.)
|
|
08-01-2020 06:44 PM |
|
Ramblin Wreck
2nd String
Posts: 444
Joined: Dec 2014
Reputation: 17
I Root For: Georgia Tech/ UAB/ Bama
Location:
|
RE: Stadiums first big concrete pour is happening now
Was in Birmingham today (Saturday) so made it a point to drive around the stadium. It is going to be really nice, I was amazed. Lots and lots of construction workers out there today. Not sure if they were making up a rain day or if they work every weekend?
|
|
08-01-2020 09:11 PM |
|
WesternBlazer
Hall of Famer
Posts: 22,195
Joined: Jan 2008
Reputation: 90
I Root For: UAB
Location:
|
RE: Stadiums first big concrete pour is happening now
(08-01-2020 09:11 PM)Ramblin Wreck Wrote: Was in Birmingham today (Saturday) so made it a point to drive around the stadium. It is going to be really nice, I was amazed. Lots and lots of construction workers out there today. Not sure if they were making up a rain day or if they work every weekend?
They work every Sat morning...
|
|
08-01-2020 09:14 PM |
|
kdblazer
All American
Posts: 2,573
Joined: May 2007
Reputation: 32
I Root For: UAB
Location: Mtn View Forrest
|
RE: Stadiums first big concrete pour is happening now
(08-01-2020 09:14 PM)WesternBlazer Wrote: (08-01-2020 09:11 PM)Ramblin Wreck Wrote: Was in Birmingham today (Saturday) so made it a point to drive around the stadium. It is going to be really nice, I was amazed. Lots and lots of construction workers out there today. Not sure if they were making up a rain day or if they work every weekend?
They work every Sat morning...
Yes they were. I drove by as well. Actually circled the site to get all angles. They've started the masonry work on the north side of the stadium too.
|
|
08-01-2020 11:48 PM |
|
jaymay2525
All American
Posts: 3,567
Joined: Jan 2005
Reputation: 30
I Root For:
Location:
|
RE: Stadiums first big concrete pour is happening now
I really wish we had another stadium camera angle from the opposite side so we could see both
|
|
08-03-2020 03:16 PM |
|
BAMANBLAZERFAN
Hall of Famer
Posts: 17,221
Joined: Oct 2005
Reputation: 57
I Root For: UAB & Bama
Location: Cropwell, AL
|
RE: Stadiums first big concrete pour is happening now
(08-01-2020 12:04 PM)ATTALLABLAZE Wrote: If there is only one scoreboard I’m not going. There are just some things I cannot compromise on.
Like many fans, I am expecting the new stadium to have a multifunctional main scoreboard with LED lights that provide replays, acknowledge Blazer donors, groups that buy blocks of tickets for a company's special occasion, lead cheers, score updates, etc. We might expect some "wrap around " display like we see on vertical surfaces in other new venues.
|
|
08-03-2020 05:35 PM |
|
Plaid Blazer
Bench Warmer
Posts: 192
Joined: Mar 2020
Reputation: 1
I Root For: UAB
Location:
|
RE: Stadiums first big concrete pour is happening now
I hope nobody else needs concrete in Birmingham because we are taking it all this morning.
|
|
08-04-2020 08:24 AM |
|
BlazrDawg
Heisman
Posts: 6,953
Joined: Oct 2004
Reputation: 49
I Root For: UAB
Location:
|
RE: Stadiums first big concrete pour is happening now
Another pour started last night around 2AM and just finished at about 11AM on the Southwest portion of the 3nd level.
(This post was last modified: 08-04-2020 11:48 AM by BlazrDawg.)
|
|
08-04-2020 11:45 AM |
|
UAB Band Dad
Occasionally Reasonable
Posts: 24,437
Joined: Dec 2004
Reputation: 277
I Root For: A Free UAB!
Location:
|
RE: Stadiums first big concrete pour is happening now
If the stadium does not have the video board in one end zone and the speakers on the other end I won't be able to recognize it as a UAB game.
|
|
08-05-2020 06:02 AM |
|
blazr
Hall of Famer
Posts: 12,989
Joined: Nov 2003
Reputation: 276
I Root For: UAB
Location: Nashville, TN
|
Stadiums first big concrete pour is happening now
(08-05-2020 06:02 AM)UAB Band Dad Wrote: If the stadium does not have the video board in one end zone and the speakers on the other end I won't be able to recognize it as a UAB game.
Sent from my iPhone using Tapatalk
|
|
08-05-2020 08:17 AM |
|