This is only getting about an 18 hour jump for those of you attending tomorrow's OwlFest, but for the remote people...
The fleck/epoxy is not a smooth surface - I'd call it "lumpy".
This will help a lot with wet surface traction.
The new surface goes all the way to the physical gates at Gate 3.
Doubt they're going to do anything with the asphalt surface on the south end, above the non-seats and under the R-Room.
Steps, as seen from above
SW men's room
If they can find a way to clean the partitions, this will be pretty nice.
What kind of stainless steel rusts like that?
New entrances on the east side restroom renovations
It's nice tile...
That used to be a pee wall.
Local water heater - doesn't have to travel an impossible distance.
More of the men's room
The tile being used.
IMHO, this is even nicer than the tile on the west side.
Ladies' room isn't as far along
12" x 48" LED panels - no bulbs to burn out or change.
I installed an identical panel in my garage about 3 years ago.
Very bright.
This renovation impresses me - bright light, inexpensive, low maintenance, no dead bugs in the light diffuser.
East side concession area is flecked/epoxied.
NE concourse prepped for fleck/epoxy.
West side has nearly complete fleck/epoxy.
This side isn't going to rust any more.
All the way to the press box elevator