Hello There, Guest! (LoginRegister)

Post Reply 
Stadium Renovation and Construction Thread
Author Message
HawaiiMongoose Offline
All American
*

Posts: 4,769
Joined: Nov 2010
Reputation: 453
I Root For: Hawaii
Location: Honolulu
Post: #1121
RE: Stadium Renovation and Construction Thread
Finally.

07-08-2022 03:08 AM
Find all posts by this user Quote this message in a reply
Transic_nyc Offline
1st String
*

Posts: 2,409
Joined: Jun 2014
Reputation: 196
I Root For: Return To Stability
Location:
Post: #1122
RE: Stadium Renovation and Construction Thread
07-13-2022 08:40 AM
Find all posts by this user Quote this message in a reply
AztecEmpire Offline
2nd String
*

Posts: 306
Joined: May 2020
Reputation: 28
I Root For: SDSU
Location:
Post: #1123
RE: Stadium Renovation and Construction Thread


(This post was last modified: 07-13-2022 09:26 PM by AztecEmpire.)
07-13-2022 09:26 PM
Find all posts by this user Quote this message in a reply
indianasniff Offline
All American
*

Posts: 3,865
Joined: Dec 2012
Reputation: 29
I Root For: Toledo
Location:
Post: #1124
RE: Stadium Renovation and Construction Thread
07-28-2022 07:15 AM
Find all posts by this user Quote this message in a reply
indianasniff Offline
All American
*

Posts: 3,865
Joined: Dec 2012
Reputation: 29
I Root For: Toledo
Location:
Post: #1125
RE: Stadium Renovation and Construction Thread
https://www.augie.edu/news/2022/augustan...e-day-2023

Augustana University’s Men’s Hockey Program and Midco Arena Gearing Up for Game Day in 2023
07-28-2022 07:16 AM
Find all posts by this user Quote this message in a reply
The Sicatoka Offline
All American
*

Posts: 2,618
Joined: Jul 2013
Reputation: 393
I Root For: North Dakota
Location: see above
Post: #1126
RE: Stadium Renovation and Construction Thread
This is old Memorial Stadium at North Dakota (current home: Alerus Center).

The Fritz Pollard Center (100 yd field, 300 m track) is up and running for a few seasons is the building on the right of image. Fundraising for the phase two expansion on that is close to complete and they're close to starting construction there (training and meeting spaces).

A public private partnership is putting in the five story building "Memorial Village" in the foreground. Bottom floor is UND Football coaches spaces; top four floors are "off campus" apartments. There's an enclosed walkway (top of image) connecting the two.

[Image: FYORm3kXoAIAiVJ?format=jpg&name=small]
(This post was last modified: 07-28-2022 08:09 AM by The Sicatoka.)
07-28-2022 08:08 AM
Find all posts by this user Quote this message in a reply
Aztecgolfer Offline
All American
*

Posts: 2,514
Joined: Jan 2021
Reputation: 203
I Root For: San Diego State
Location: San Diego
Post: #1127
RE: Stadium Renovation and Construction Thread
(05-29-2022 08:19 AM)AztecEmpire Wrote:  SDSU’s Snapdragon Stadium Update. Less than one 100 days to opening Kickoff.





First time I've seen this video. Cool.
07-28-2022 09:57 AM
Find all posts by this user Quote this message in a reply
AztecEmpire Offline
2nd String
*

Posts: 306
Joined: May 2020
Reputation: 28
I Root For: SDSU
Location:
Post: #1128
RE: Stadium Renovation and Construction Thread
(07-28-2022 09:57 AM)Aztecgolfer Wrote:  
(05-29-2022 08:19 AM)AztecEmpire Wrote:  SDSU’s Snapdragon Stadium Update. Less than one 100 days to opening Kickoff.





First time I've seen this video. Cool.

This guy tends to make the best drone videos of the new stadium. Here's the July update. It's really coming together now.



07-28-2022 10:27 AM
Find all posts by this user Quote this message in a reply
VNova Offline
2nd String
*

Posts: 362
Joined: Dec 2017
Reputation: 30
I Root For: App State, UCSD
Location: CA
Post: #1129
RE: Stadium Renovation and Construction Thread
(07-28-2022 10:27 AM)AztecEmpire Wrote:  
(07-28-2022 09:57 AM)Aztecgolfer Wrote:  
(05-29-2022 08:19 AM)AztecEmpire Wrote:  SDSU’s Snapdragon Stadium Update. Less than one 100 days to opening Kickoff.





First time I've seen this video. Cool.

This guy tends to make the best drone videos of the new stadium. Here's the July update. It's really coming together now.




I left San Diego a few years back and I'm still excited to see this stadium for the first time.
07-28-2022 10:51 AM
Find all posts by this user Quote this message in a reply
BCSvsBS Offline
Special Teams
*

Posts: 711
Joined: Jan 2021
Reputation: 84
I Root For: USF
Location: In a moment in time.
Post: #1130
RE: Stadium Renovation and Construction Thread
(06-16-2022 05:06 PM)TexanMark Wrote:  
(06-16-2022 04:17 PM)Just Joe Wrote:  
(06-15-2022 08:52 PM)BullsFanInTX Wrote:  https://www.tampabay.com/sports/bulls/20...l-stadium/

The latest on USF's on campus stadium.

-Opening 2026
-Construction starting in 2024
-35K capacity (think SDSU Snapdragon stadium). Could change slightly.
-Includes a football operations center facility (likely)
-Near under construction IPF
-USF to now get proposals from Design/Construction companies
-Company likely to be selected Sep 6th
-Rendering should come then

USF has been able to get some big schools to agree to come to town due to the ability to play in an NFL stadium in a prime recruiting area. Is it expected the Miami game in 2027 and the Notre Dame game in 2029 will stay at RJS or move to campus? Miami's one thing but I have a hard time envisioning ND playing an AAC school in a 35,000 seat stadium.

ND won't play at a 35K seat stadium...they can easily sell out out the RJS

That's an interesting theory but, ND has never sold out RJS. So, I would put your comment in my "Wishful Thinking Basket". 07-coffee3
(This post was last modified: 07-28-2022 11:31 AM by BCSvsBS.)
07-28-2022 11:31 AM
Find all posts by this user Quote this message in a reply
Hammersmith Offline
2nd String
*

Posts: 279
Joined: Jul 2014
Reputation: 40
I Root For: NDSU
Location:
Post: #1131
RE: Stadium Renovation and Construction Thread
It's not the greatest video unless you enjoy quick cuts and being on the edge of motion sickness, but here is a construction progress video on NDSU's new football performance complex. The footage is about a month old and they've made a ton of progress since then. NDSU and Fargo are buying three complete turfs this summer. The first went into the Fargodome last month so we'll finally have straight lines again(lol), the second was just installed outside this practice facility in the big rectangular patch of dirt in the video, and the last will go inside this facility in the next month or two. The building is weathertight now and the inside is being painted.





Originally planned to be built in two phases, fundraising went well enough that they've started phase 2 already. Phase 1(~$38M) is what you see in the video: An outdoor field, the basic IPF building, and a couple small support additions. Phase 2(~$12M) will be a dedicated FB weight room, locker room, and sports medicine facilities. Football also has a very nice set of locker rooms, offices, training rooms, and meeting spaces at the Fargodome, but this gives the FB team a set of facilities as part of their practice spaces. The outdoor turf will be ready in a week, phase 1 will be finished by October, and phase 2 will be finished next spring.

The facility will also be used somewhat by the NDSU soccer, baseball, softball, golf, and throwing teams. NDSU already has a pretty new(2012) dedicated indoor track facility, so there's no need to compromise this facility by putting a track around the field. Speaking of T&F, NDSU is also in the process of completely rebuilding its outdoor T&F facility. The new track surface went in last summer, and the new grandstand, pressbox, and timing suite are going in right now. Next year, work should start on an indoor softball practice facility. It won't cover an entire softball diamond or anything, but it will have dedicated pitching and hitting areas plus a locker room and training/medical spaces.

The following link is a Google Maps satellite view from last summer of almost the entire NDSU sports complex. The Fargodome is at the top of the image. You can see the work that was being done on the outdoor T&F complex for the new track. The new FB IPF is being built in the bottom right where those FB fields are. The new SB facility will be going in just between the softball field and the parking lot labeled NQ. The only NDSU sport facility not in this image is the VB facility to the south in the historic NDSU fieldhouse. And if you zoom out just a little bit, you will see why NDSU might be the easiest DI sports program to get to once your team gets off the plane. 03-wink

https://www.google.com/maps/@46.9001163,...!1e3?hl=en
(This post was last modified: 07-28-2022 01:13 PM by Hammersmith.)
07-28-2022 01:11 PM
Find all posts by this user Quote this message in a reply
RobUCF Offline
1st String
*

Posts: 1,338
Joined: Nov 2010
Reputation: 104
I Root For: UCF
Location: Palm Harbor, FL
Post: #1132
RE: Stadium Renovation and Construction Thread
(07-28-2022 11:31 AM)BCSvsBS Wrote:  
(06-16-2022 05:06 PM)TexanMark Wrote:  
(06-16-2022 04:17 PM)Just Joe Wrote:  
(06-15-2022 08:52 PM)BullsFanInTX Wrote:  https://www.tampabay.com/sports/bulls/20...l-stadium/

The latest on USF's on campus stadium.

-Opening 2026
-Construction starting in 2024
-35K capacity (think SDSU Snapdragon stadium). Could change slightly.
-Includes a football operations center facility (likely)
-Near under construction IPF
-USF to now get proposals from Design/Construction companies
-Company likely to be selected Sep 6th
-Rendering should come then

USF has been able to get some big schools to agree to come to town due to the ability to play in an NFL stadium in a prime recruiting area. Is it expected the Miami game in 2027 and the Notre Dame game in 2029 will stay at RJS or move to campus? Miami's one thing but I have a hard time envisioning ND playing an AAC school in a 35,000 seat stadium.

ND won't play at a 35K seat stadium...they can easily sell out out the RJS

That's an interesting theory but, ND has never sold out RJS. So, I would put your comment in my "Wishful Thinking Basket". 07-coffee3

Has Notre Dame ever actually played at RJS?

Also, if you don't think Notre Dame vs. USF can sellout RJS, aren't you insulting your own fan base just as much as theirs?
07-28-2022 01:27 PM
Find all posts by this user Quote this message in a reply
BCSvsBS Offline
Special Teams
*

Posts: 711
Joined: Jan 2021
Reputation: 84
I Root For: USF
Location: In a moment in time.
Post: #1133
RE: Stadium Renovation and Construction Thread
(07-28-2022 01:27 PM)RobUCF Wrote:  
(07-28-2022 11:31 AM)BCSvsBS Wrote:  
(06-16-2022 05:06 PM)TexanMark Wrote:  
(06-16-2022 04:17 PM)Just Joe Wrote:  
(06-15-2022 08:52 PM)BullsFanInTX Wrote:  https://www.tampabay.com/sports/bulls/20...l-stadium/

The latest on USF's on campus stadium.

-Opening 2026
-Construction starting in 2024
-35K capacity (think SDSU Snapdragon stadium). Could change slightly.
-Includes a football operations center facility (likely)
-Near under construction IPF
-USF to now get proposals from Design/Construction companies
-Company likely to be selected Sep 6th
-Rendering should come then

USF has been able to get some big schools to agree to come to town due to the ability to play in an NFL stadium in a prime recruiting area. Is it expected the Miami game in 2027 and the Notre Dame game in 2029 will stay at RJS or move to campus? Miami's one thing but I have a hard time envisioning ND playing an AAC school in a 35,000 seat stadium.

ND won't play at a 35K seat stadium...they can easily sell out out the RJS

That's an interesting theory but, ND has never sold out RJS. So, I would put your comment in my "Wishful Thinking Basket". 07-coffee3

Has Notre Dame ever actually played at RJS?

Also, if you don't think Notre Dame vs. USF can sellout RJS, aren't you insulting your own fan base just as much as theirs?

Urm, read his post. He made it sound like ND fans alone would sell out RJS. I doubt his claim. I know USF has had a number of Sellouts at RJS. So I know USF can sell RJS out with almost any "GOOD opponent.. 05-stirthepot
(This post was last modified: 07-28-2022 02:44 PM by BCSvsBS.)
07-28-2022 02:43 PM
Find all posts by this user Quote this message in a reply
Renandpat Offline
1st String
*

Posts: 1,158
Joined: May 2017
Reputation: 35
I Root For: Central State
Location:
Post: #1134
RE: Stadium Renovation and Construction Thread
(07-28-2022 01:27 PM)RobUCF Wrote:  
(07-28-2022 11:31 AM)BCSvsBS Wrote:  
(06-16-2022 05:06 PM)TexanMark Wrote:  
(06-16-2022 04:17 PM)Just Joe Wrote:  
(06-15-2022 08:52 PM)BullsFanInTX Wrote:  https://www.tampabay.com/sports/bulls/20...l-stadium/

The latest on USF's on campus stadium.

-Opening 2026
-Construction starting in 2024
-35K capacity (think SDSU Snapdragon stadium). Could change slightly.
-Includes a football operations center facility (likely)
-Near under construction IPF
-USF to now get proposals from Design/Construction companies
-Company likely to be selected Sep 6th
-Rendering should come then

USF has been able to get some big schools to agree to come to town due to the ability to play in an NFL stadium in a prime recruiting area. Is it expected the Miami game in 2027 and the Notre Dame game in 2029 will stay at RJS or move to campus? Miami's one thing but I have a hard time envisioning ND playing an AAC school in a 35,000 seat stadium.

ND won't play at a 35K seat stadium...they can easily sell out out the RJS

That's an interesting theory but, ND has never sold out RJS. So, I would put your comment in my "Wishful Thinking Basket". 07-coffee3

Has Notre Dame ever actually played at RJS?

Also, if you don't think Notre Dame vs. USF can sellout RJS, aren't you insulting your own fan base just as much as theirs?
Their two meetings between the schools were both in South Bend. The game currently scheduled for 2029 is set to be in Tampa, with another game in South Bend "set" for 2031.
(This post was last modified: 07-28-2022 03:13 PM by Renandpat.)
07-28-2022 03:12 PM
Find all posts by this user Quote this message in a reply
Aztecgolfer Offline
All American
*

Posts: 2,514
Joined: Jan 2021
Reputation: 203
I Root For: San Diego State
Location: San Diego
Post: #1135
RE: Stadium Renovation and Construction Thread
(07-28-2022 10:51 AM)VNova Wrote:  
(07-28-2022 10:27 AM)AztecEmpire Wrote:  
(07-28-2022 09:57 AM)Aztecgolfer Wrote:  
(05-29-2022 08:19 AM)AztecEmpire Wrote:  SDSU’s Snapdragon Stadium Update. Less than one 100 days to opening Kickoff.





First time I've seen this video. Cool.

This guy tends to make the best drone videos of the new stadium. Here's the July update. It's really coming together now.




I left San Diego a few years back and I'm still excited to see this stadium for the first time.

I live just up the road from the stadium in San Carlos. Me and my golf buddies will be going to either an Aztec game or a Wave game to check things out this year. I really hope that the rest of the development is done quickly. I know the River Park was to be second per the agreement with the city and is being done now, but I really want to see the rest happen as fast as possible. We are turning an eyesore in the valley into a jewel.
07-28-2022 08:30 PM
Find all posts by this user Quote this message in a reply
BraveKnight Offline
All American
*

Posts: 4,332
Joined: Jul 2019
Reputation: 210
I Root For: UCF
Location: Orlando
Post: #1136
RE: Stadium Renovation and Construction Thread
(07-28-2022 02:43 PM)BCSvsBS Wrote:  
(07-28-2022 01:27 PM)RobUCF Wrote:  
(07-28-2022 11:31 AM)BCSvsBS Wrote:  
(06-16-2022 05:06 PM)TexanMark Wrote:  
(06-16-2022 04:17 PM)Just Joe Wrote:  USF has been able to get some big schools to agree to come to town due to the ability to play in an NFL stadium in a prime recruiting area. Is it expected the Miami game in 2027 and the Notre Dame game in 2029 will stay at RJS or move to campus? Miami's one thing but I have a hard time envisioning ND playing an AAC school in a 35,000 seat stadium.

ND won't play at a 35K seat stadium...they can easily sell out out the RJS

That's an interesting theory but, ND has never sold out RJS. So, I would put your comment in my "Wishful Thinking Basket". 07-coffee3

Has Notre Dame ever actually played at RJS?

Also, if you don't think Notre Dame vs. USF can sellout RJS, aren't you insulting your own fan base just as much as theirs?

Urm, read his post. He made it sound like ND fans alone would sell out RJS. I doubt his claim. I know USF has had a number of Sellouts at RJS. So I know USF can sell RJS out with almost any "GOOD opponent.. 05-stirthepot
Well considering when Wisconsin came to RJS it was a sea of red (not the sea of empty red seats that you usually see at usf home games this time), and when UCF comes to RJS it’s usually a sea of black and gold. I don’t think his claim is that off base.
07-28-2022 09:52 PM
Find all posts by this user Quote this message in a reply
jimrtex Offline
All American
*

Posts: 2,581
Joined: Aug 2021
Reputation: 260
I Root For: Houston, Tulsa, Colorado
Location:
Post: #1137
RE: Stadium Renovation and Construction Thread
(07-28-2022 07:16 AM)indianasniff Wrote:  https://www.augie.edu/news/2022/augustan...e-day-2023

Augustana University’s Men’s Hockey Program and Midco Arena Gearing Up for Game Day in 2023
How many hockey arenas have a sponsored penalty box?
07-30-2022 06:08 AM
Find all posts by this user Quote this message in a reply
BCSvsBS Offline
Special Teams
*

Posts: 711
Joined: Jan 2021
Reputation: 84
I Root For: USF
Location: In a moment in time.
Post: #1138
RE: Stadium Renovation and Construction Thread
(07-28-2022 09:52 PM)BraveKnight Wrote:  
(07-28-2022 02:43 PM)BCSvsBS Wrote:  
(07-28-2022 01:27 PM)RobUCF Wrote:  
(07-28-2022 11:31 AM)BCSvsBS Wrote:  
(06-16-2022 05:06 PM)TexanMark Wrote:  ND won't play at a 35K seat stadium...they can easily sell out out the RJS

That's an interesting theory but, ND has never sold out RJS. So, I would put your comment in my "Wishful Thinking Basket". 07-coffee3

Has Notre Dame ever actually played at RJS?

Also, if you don't think Notre Dame vs. USF can sellout RJS, aren't you insulting your own fan base just as much as theirs?

Urm, read his post. He made it sound like ND fans alone would sell out RJS. I doubt his claim. I know USF has had a number of Sellouts at RJS. So I know USF can sell RJS out with almost any "GOOD opponent.. 05-stirthepot
Well considering when Wisconsin came to RJS it was a sea of red (not the sea of empty red seats that you usually see at usf home games this time), and when UCF comes to RJS it’s usually a sea of black and gold. I don’t think his claim is that off base.

It's way off base when we field a competitive team. We were selling out RJS with huge numbers of Bulls fans politics got involved and we lost our coach. That was that. 07-coffee3

My hope is that when our new stadium is completed, we don't make the same mistakes. 07-coffee3
07-30-2022 06:29 AM
Find all posts by this user Quote this message in a reply
Aztecgolfer Offline
All American
*

Posts: 2,514
Joined: Jan 2021
Reputation: 203
I Root For: San Diego State
Location: San Diego
Post: #1139
RE: Stadium Renovation and Construction Thread
The Piers and rooftop bar:

[Image: FZKqe3GUEAA60n0?format=jpg&name=large]
08-02-2022 01:49 PM
Find all posts by this user Quote this message in a reply
HawaiiMongoose Offline
All American
*

Posts: 4,769
Joined: Nov 2010
Reputation: 453
I Root For: Hawaii
Location: Honolulu
Post: #1140
RE: Stadium Renovation and Construction Thread
(08-02-2022 01:49 PM)Aztecgolfer Wrote:  The Piers and rooftop bar:

Very cool design element.
08-02-2022 02:29 PM
Find all posts by this user Quote this message in a reply
Post Reply 




User(s) browsing this thread: 1 Guest(s)


Copyright © 2002-2024 Collegiate Sports Nation Bulletin Board System (CSNbbs), All Rights Reserved.
CSNbbs is an independent fan site and is in no way affiliated to the NCAA or any of the schools and conferences it represents.
This site monetizes links. FTC Disclosure.
We allow third-party companies to serve ads and/or collect certain anonymous information when you visit our web site. These companies may use non-personally identifiable information (e.g., click stream information, browser type, time and date, subject of advertisements clicked or scrolled over) during your visits to this and other Web sites in order to provide advertisements about goods and services likely to be of greater interest to you. These companies typically use a cookie or third party web beacon to collect this information. To learn more about this behavioral advertising practice or to opt-out of this type of advertising, you can visit http://www.networkadvertising.org.
Powered By MyBB, © 2002-2024 MyBB Group.