Hambone10
Hooter

Posts: 41,249
Joined: Nov 2005
Reputation: 1310
I Root For: My Kids
Location: Right Down th Middle
 
|
RE: HRS / EZF Athletics Construction Thread
energyvault.com is the system I saw.... and they show the column/shaft I was picturing and the rising weight. I don't understand the 'arms' of this version and imagined something moving up and down within what is essentially an external elevator shaft, but 'whatever'. I'm not the engineer.
|
|
| 09-29-2021 07:15 AM |
|
GoodOwl
The 1 Hoo Knocks

Posts: 29,300
Joined: Nov 2010
Reputation: 4915
I Root For: New Horizons
Location: Planiverse
|
RE: HRS / EZF Athletics Construction Thread
Not holding my breath for it, but just in case, the AthDept might peruse some of the ideas posted in thei thread and finally fix those bathrroms and the electrical issues. Plus, with Rice being so...lets' say modern-minded...what is their big problem with updating and making the stadium conform completely to the Americans with Disabilities Act with all the necessary upgrades? There are plenty of engineers available both alum and on-campous to get the job done. Maybe the stars will align and the U will finally ibvest its own money (not others') in it. Again, not gonna hold my breath, but would be nice to see for a change.
|
|
| 10-21-2021 01:15 PM |
|
Hambone10
Hooter

Posts: 41,249
Joined: Nov 2005
Reputation: 1310
I Root For: My Kids
Location: Right Down th Middle
 
|
RE: HRS / EZF Athletics Construction Thread
(10-21-2021 01:15 PM)GoodOwl Wrote: Not holding my breath for it, but just in case, the AthDept might peruse some of the ideas posted in thei thread and finally fix those bathrroms and the electrical issues. Plus, with Rice being so...lets' say modern-minded...what is their big problem with updating and making the stadium conform completely to the Americans with Disabilities Act with all the necessary upgrades? There are plenty of engineers available both alum and on-campous to get the job done. Maybe the stars will align and the U will finally ibvest its own money (not others') in it. Again, not gonna hold my breath, but would be nice to see for a change.
Lots of things that just aren't possible regarding the current press box and 2nd deck restrooms. We'd need to something like double or triple the sewer lines etc etc I think even the slopes from the lower level to the concourse are too steep.
|
|
| 10-21-2021 02:15 PM |
|
75src
All American

Posts: 3,623
Joined: Mar 2009
Reputation: 25
I Root For: Rice
Location:
|
RE: HRS / EZF Athletics Construction Thread
It is possible to run lines under Harris Gully. The stadium itself was built with the gully contained under it in a conduit.
(09-28-2021 10:40 AM)Grungy Wrote: As Hambone says, one of the issues with improving HRS is increasing the available amperage.
The concession areas can't cook on-site, because there's no power for it.
There's no power for walk-in cooler/freezers, either.
All concessions rely on product shipped in.
There is some refrigerator space, but it's nothing like the facilities at other stadia.
All power on campus is subterranean - there are no wires above ground.
Getting wires to the stadium from either of the power plants requires crossing the invisible Harris Gully.
How much spare capacity is there in the existing conduit?
How did they get sufficient capability installed to power Patterson and the practice dome?
Patterson requires significantly more power than either the original north end restroom structure or the large scoreboards.
The dome is another thing altogether.
They ran power to it from the west side of the stadium, beneath the Greenbriar lot.
They found some way to pull in more amps for those improvements.
What would it take to bring in more?
|
|
| 10-21-2021 11:10 PM |
|
75src
All American

Posts: 3,623
Joined: Mar 2009
Reputation: 25
I Root For: Rice
Location:
|
RE: HRS / EZF Athletics Construction Thread
It is possible to run lines under Harris Gully. The stadium itself was built with the gully contained under it in a conduit.
(09-28-2021 10:40 AM)Grungy Wrote: As Hambone says, one of the issues with improving HRS is increasing the available amperage.
The concession areas can't cook on-site, because there's no power for it.
There's no power for walk-in cooler/freezers, either.
All concessions rely on product shipped in.
There is some refrigerator space, but it's nothing like the facilities at other stadia.
All power on campus is subterranean - there are no wires above ground.
Getting wires to the stadium from either of the power plants requires crossing the invisible Harris Gully.
How much spare capacity is there in the existing conduit?
How did they get sufficient capability installed to power Patterson and the practice dome?
Patterson requires significantly more power than either the original north end restroom structure or the large scoreboards.
The dome is another thing altogether.
They ran power to it from the west side of the stadium, beneath the Greenbriar lot.
They found some way to pull in more amps for those improvements.
What would it take to bring in more?
|
|
| 10-21-2021 11:10 PM |
|
GoodOwl
The 1 Hoo Knocks

Posts: 29,300
Joined: Nov 2010
Reputation: 4915
I Root For: New Horizons
Location: Planiverse
|
RE: HRS / EZF Athletics Construction Thread
(10-21-2021 11:10 PM)75src Wrote: It is possible to run lines under Harris Gully. The stadium itself was built with the gully contained under it in a conduit.
(09-28-2021 10:40 AM)Grungy Wrote: As Hambone says, one of the issues with improving HRS is increasing the available amperage.
The concession areas can't cook on-site, because there's no power for it.
There's no power for walk-in cooler/freezers, either.
All concessions rely on product shipped in.
There is some refrigerator space, but it's nothing like the facilities at other stadia.
All power on campus is subterranean - there are no wires above ground.
Getting wires to the stadium from either of the power plants requires crossing the invisible Harris Gully.
How much spare capacity is there in the existing conduit?
How did they get sufficient capability installed to power Patterson and the practice dome?
Patterson requires significantly more power than either the original north end restroom structure or the large scoreboards.
The dome is another thing altogether.
They ran power to it from the west side of the stadium, beneath the Greenbriar lot.
They found some way to pull in more amps for those improvements.
What would it take to bring in more?
I've seen old pics with Harris Gully in them. I'm not saying that it and other items aren't issues, but my goodness, how can one of the top engineering schools not deal with this and just get it done already? I mean, it's like: "We're Rice, we are tops at solving big problems and bringing unconventional wisdom and world class academics to bear on almost anything, EXCEPT...we can't do what is necessary/figure out how to fix some electrical and gully conduit issues with our own football stadium." It's just strikes one as incongruent to see those two juxtaposed for all these years, given the school's rhetoric about its prowess and strengths.
|
|
| 10-22-2021 11:43 AM |
|
Tomball Owl
Hall of Famer

Posts: 16,075
Joined: Oct 2005
Reputation: 80
I Root For: Rice Owls
Location: Montgomery County
|
RE: HRS / EZF Athletics Construction Thread
(10-22-2021 11:43 AM)GoodOwl Wrote: (10-21-2021 11:10 PM)75src Wrote: It is possible to run lines under Harris Gully. The stadium itself was built with the gully contained under it in a conduit.
(09-28-2021 10:40 AM)Grungy Wrote: As Hambone says, one of the issues with improving HRS is increasing the available amperage.
The concession areas can't cook on-site, because there's no power for it.
There's no power for walk-in cooler/freezers, either.
All concessions rely on product shipped in.
There is some refrigerator space, but it's nothing like the facilities at other stadia.
All power on campus is subterranean - there are no wires above ground.
Getting wires to the stadium from either of the power plants requires crossing the invisible Harris Gully.
How much spare capacity is there in the existing conduit?
How did they get sufficient capability installed to power Patterson and the practice dome?
Patterson requires significantly more power than either the original north end restroom structure or the large scoreboards.
The dome is another thing altogether.
They ran power to it from the west side of the stadium, beneath the Greenbriar lot.
They found some way to pull in more amps for those improvements.
What would it take to bring in more?
I've seen old pics with Harris Gully in them. I'm not saying that it and other items aren't issues, but my goodness, how can one of the top engineering schools not deal with this and just get it done already? I mean, it's like: "We're Rice, we are tops at solving big problems and bringing unconventional wisdom and world class academics to bear on almost anything, EXCEPT...we can't do what is necessary/figure out how to fix some electrical and gully conduit issues with our own football stadium." It's just strikes one as incongruent to see those two juxtaposed for all these years, given the school's rhetoric about its prowess and strengths.
Can’t or don’t want to?
|
|
| 10-22-2021 12:08 PM |
|
Texasowl
1st String

Posts: 2,092
Joined: Apr 2020
Reputation: 18
I Root For: Rice University
Location:
|
RE: HRS / EZF Athletics Construction Thread
What improvements are planned for HRS since joining the AAC?
|
|
| 10-24-2021 08:19 PM |
|
Grungy
Moderator

Posts: 3,167
Joined: Nov 2005
Reputation: 91
I Root For: Rice
Location: Pasadena
|
RE: HRS / EZF Athletics Construction Thread
(10-24-2021 08:19 PM)Texasowl Wrote: What improvements are planned for HRS since joining the AAC?
There are plans, and they pre-date the AAC announcement, but they haven't been made public yet. My knowledge only goes as far as hearing that something is in the works.
Waiting is...
|
|
| 10-24-2021 10:53 PM |
|
Intellectual_Brutality
1st String

Posts: 1,429
Joined: Dec 2017
Reputation: 12
I Root For: Rice Owls!
Location:
|
RE: HRS / EZF Athletics Construction Thread
Perhaps Patterson's biggest role was in helping us get into the AAC than recruiting...
|
|
| 10-24-2021 11:44 PM |
|
GoodOwl
The 1 Hoo Knocks

Posts: 29,300
Joined: Nov 2010
Reputation: 4915
I Root For: New Horizons
Location: Planiverse
|
RE: HRS / EZF Athletics Construction Thread
(10-24-2021 10:53 PM)Grungy Wrote: (10-24-2021 08:19 PM)Texasowl Wrote: What improvements are planned for HRS since joining the AAC?
There are plans, and they pre-date the AAC announcement, but they haven't been made public yet. My knowledge only goes as far as hearing that something is in the works.
Waiting is...
...like being on double secret probation?
|
|
| 10-28-2021 12:49 PM |
|
GoodOwl
The 1 Hoo Knocks

Posts: 29,300
Joined: Nov 2010
Reputation: 4915
I Root For: New Horizons
Location: Planiverse
|
RE: HRS / EZF Athletics Construction Thread
|
|
| 01-22-2022 03:20 PM |
|
GoodOwl
The 1 Hoo Knocks

Posts: 29,300
Joined: Nov 2010
Reputation: 4915
I Root For: New Horizons
Location: Planiverse
|
RE: HRS / EZF Athletics Construction Thread
(01-23-2015 11:09 AM)bobreinhold1 Wrote: Per the AD, construction to begin February 17.
Ah, yes....but of course.
Seriously, though, if they are actually working on some actual plans to do something about:
1. the South End Zone,
2. the Press Box,
3. the Rest Rooms
4. the Electrical Service
5. the Concessions
6. the Upper Deck
7. the general look, signage and landscaping
might any of the ideas proposed here over the yaers (since Bob wrote the above quote) be incorporated? I think the HRS as Giant Sportsbar idea would grealy help attendance, along with some chicken wings and servers to help serve them.
|
|
| 02-17-2022 12:34 PM |
|
ranfin
Special Teams

Posts: 931
Joined: Jun 2008
Reputation: 9
I Root For: Rice
Location:
|
RE: HRS / EZF Athletics Construction Thread
If construction begins that soon, I’m at a loss to understand why they can’t tell us exactly what is going to be done. It’s weird.
quote='GoodOwl' pid='18079514' dateline='1645119241']
(01-23-2015 11:09 AM)bobreinhold1 Wrote: Per the AD, construction to begin February 17.
Ah, yes....but of course.
Seriously, though, if they are actually working on some actual plans to do something about:
1. the South End Zone,
2. the Press Box,
3. the Rest Rooms
4. the Electrical Service
5. the Concessions
6. the Upper Deck
7. the general look, signage and landscaping
might any of the ideas proposed here over the yaers (since Bob wrote the above quote) be incorporated? I think the HRS as Giant Sportsbar idea would grealy help attendance, along with some chicken wings and servers to help serve them.
[/quote]
|
|
| 02-17-2022 12:44 PM |
|
loki_the_bubba
Heisman

Posts: 6,762
Joined: Jul 2010
Reputation: 1124
I Root For: Rice Owls
Location:
|
RE: HRS / EZF Athletics Construction Thread
(02-17-2022 12:44 PM)ranfin Wrote: If construction begins that soon, I’m at a loss to understand why they can’t tell us exactly what is going to be done. It’s weird.
quote='GoodOwl' pid='18079514' dateline='1645119241']
(01-23-2015 11:09 AM)bobreinhold1 Wrote: Per the AD, construction to begin February 17.
Ah, yes....but of course.
Seriously, though, if they are actually working on some actual plans to do something about:
1. the South End Zone,
2. the Press Box,
3. the Rest Rooms
4. the Electrical Service
5. the Concessions
6. the Upper Deck
7. the general look, signage and landscaping
might any of the ideas proposed here over the yaers (since Bob wrote the above quote) be incorporated? I think the HRS as Giant Sportsbar idea would grealy help attendance, along with some chicken wings and servers to help serve them.
[/quote]
That quote is from 2015 and iirc about the Patterson.
|
|
| 02-17-2022 12:48 PM |
|
Ourland
Hall of Famer

Posts: 10,220
Joined: Apr 2017
Reputation: 984
I Root For: The Rice Owls
Location: Galveston
|
RE: HRS / EZF Athletics Construction Thread
(This post was last modified: 02-21-2022 06:13 PM by Ourland.)
|
|
| 02-21-2022 06:12 PM |
|
markbrindley
2nd String

Posts: 423
Joined: Jul 2020
Reputation: 7
I Root For: Rice
Location:
|
HRS / EZF Athletics Construction Thread
(02-21-2022 06:12 PM)Ourland Wrote: How would you guys feel about buying a life-size cannon for Rice, to go with the new stadium renovations once they are complete? They run about $3,000. A gift from The Parliament. Thoughts
https://www.google.com/search?q=life+siz...YXqCBcluaM
No need to copy the Longhorns. I’ll pass.
Sent from my iPhone using Tapatalk
|
|
| 02-21-2022 07:05 PM |
|
Tomball Owl
Hall of Famer

Posts: 16,075
Joined: Oct 2005
Reputation: 80
I Root For: Rice Owls
Location: Montgomery County
|
RE: HRS / EZF Athletics Construction Thread
(02-21-2022 07:05 PM)markbrindley Wrote: (02-21-2022 06:12 PM)Ourland Wrote: How would you guys feel about buying a life-size cannon for Rice, to go with the new stadium renovations once they are complete? They run about $3,000. A gift from The Parliament. Thoughts
https://www.google.com/search?q=life+siz...YXqCBcluaM
No need to copy the Longhorns. I’ll pass.
Sent from my iPhone using Tapatalk
And Aggies.
I’d rather contribute to a buyout fund.
|
|
| 02-21-2022 07:24 PM |
|
Ourland
Hall of Famer

Posts: 10,220
Joined: Apr 2017
Reputation: 984
I Root For: The Rice Owls
Location: Galveston
|
RE: HRS / EZF Athletics Construction Thread
There must be a better way to celebrate a touchdown than just 'Louie Louie.' C'mon, we can do better than that!
|
|
| 02-21-2022 07:58 PM |
|
Tomball Owl
Hall of Famer

Posts: 16,075
Joined: Oct 2005
Reputation: 80
I Root For: Rice Owls
Location: Montgomery County
|
RE: HRS / EZF Athletics Construction Thread
(02-21-2022 07:58 PM)Ourland Wrote: There must be a better way to celebrate a touchdown than just 'Louie Louie.' C'mon, we can do better than that!
If the Owls score and are ahead, we could bring back the “Go clock go” cheer. And if the Owls are still trailing, the “Fumble turkeys fumble” cheer.
(This post was last modified: 02-21-2022 09:18 PM by Tomball Owl.)
|
|
| 02-21-2022 09:16 PM |
|