GoodOwl Offline
The 1 Hoo Knocks
*

Posts: 25,432
Joined: Nov 2010
Reputation: 2379
I Root For: New Horizons
Location: Planiverse
Post: #161
RE: Conference USA Facilities
COGSCOGSCOGSCOGSCOGSCOGSCOGSCOGSCOGS
[Image: 93_919_2010.jpg] Marshall Swimming- "watch your wallet"
COGSCOGSCOGSCOGSCOGSCOGSCOGSCOGSCOGS
01-24-2016 02:34 PM
Find all posts by this user
GoodOwl Offline
The 1 Hoo Knocks
*

Posts: 25,432
Joined: Nov 2010
Reputation: 2379
I Root For: New Horizons
Location: Planiverse
Post: #162
RE: Conference USA Facilities
Rice Owls End Zone Facility construction update courtesy of Tiki Owl:

(01-22-2016 04:44 PM)Afflicted Wrote:  
(01-22-2016 04:40 PM)Tiki Owl Wrote:  I took this last week before the Fan Committee meeting in the R Room. I liked how it really looks like it was planned and built with the stadium...it fits the space really well.

[Image: CA06976F-B5E5-45CB-9E97-F33EF9472B98_zpsfmh0gewk.jpg]

It fits in perfectly. It looks like it was part of the original construction. Very nice. Thanks.

Rice End Zone Facility Thread
(This post was last modified: 01-24-2016 02:38 PM by GoodOwl.)
01-24-2016 02:35 PM
Find all posts by this user
paintedblue2 Offline
All American
*

Posts: 4,211
Joined: Dec 2014
Reputation: 84
I Root For: ODU
Location:
Post: #163
RE: Conference USA Facilities
(01-24-2016 02:35 PM)GoodOwl Wrote:  Rice Owls End Zone Facility construction update courtesy of Tiki Owl:

(01-22-2016 04:44 PM)Afflicted Wrote:  
(01-22-2016 04:40 PM)Tiki Owl Wrote:  I took this last week before the Fan Committee meeting in the R Room. I liked how it really looks like it was planned and built with the stadium...it fits the space really well.

[Image: CA06976F-B5E5-45CB-9E97-F33EF9472B98_zpsfmh0gewk.jpg]

It fits in perfectly. It looks like it was part of the original construction. Very nice. Thanks.

Rice End Zone Facility Thread

Effin' sweet! 04-cheers
(This post was last modified: 01-26-2016 10:23 PM by paintedblue2.)
01-26-2016 10:22 PM
Find all posts by this user
THUNDERStruck73 Offline
Complete Jackass
*

Posts: 13,166
Joined: Feb 2012
Reputation: 981
I Root For: Herd, Our Lady, & Heels
Location: Huntington, WV
Post: #164
RE: Conference USA Facilities
(01-26-2016 10:22 PM)paintedblue2 Wrote:  
(01-24-2016 02:35 PM)GoodOwl Wrote:  Rice Owls End Zone Facility construction update courtesy of Tiki Owl:

(01-22-2016 04:44 PM)Afflicted Wrote:  
(01-22-2016 04:40 PM)Tiki Owl Wrote:  I took this last week before the Fan Committee meeting in the R Room. I liked how it really looks like it was planned and built with the stadium...it fits the space really well.

[Image: CA06976F-B5E5-45CB-9E97-F33EF9472B98_zpsfmh0gewk.jpg]

It fits in perfectly. It looks like it was part of the original construction. Very nice. Thanks.

Rice End Zone Facility Thread

Effin' sweet! 04-cheers

Is this the bowled end of the stadium??? If so, that is an awesome addition by subtraction.
(This post was last modified: 01-27-2016 11:45 AM by THUNDERStruck73.)
01-27-2016 11:45 AM
Find all posts by this user
GoodOwl Offline
The 1 Hoo Knocks
*

Posts: 25,432
Joined: Nov 2010
Reputation: 2379
I Root For: New Horizons
Location: Planiverse
Post: #165
Exclamation RE: Conference USA Facilities
Pretty cool post by dragon2owl:

(01-31-2016 11:36 AM)dragon2owl Wrote:  

01-31-2016 12:10 PM
Find all posts by this user
SpaceRaider Online
All American
*

Posts: 3,722
Joined: May 2002
Reputation: 157
I Root For: MiddleTennessee
Location: God's Country
Post: #166
RE: Conference USA Facilities
Short video tour of MT's indoor facility for tennis



02-08-2016 05:53 PM
Visit this user's website Find all posts by this user
Fatalisk Offline
All American
*

Posts: 4,277
Joined: May 2012
Reputation: 44
I Root For: Old Dominion
Location:
Post: #167
RE: Conference USA Facilities
(02-08-2016 05:53 PM)SpaceRaider Wrote:  Short video tour of MT's indoor facility for tennis




Awesome facility.
02-08-2016 09:30 PM
Find all posts by this user
HogDawg Offline
Heisman
*

Posts: 7,354
Joined: Dec 2003
Reputation: 549
I Root For: LA Tech
Location: FranklinTNMcKinneyTX
Post: #168
RE: Conference USA Facilities
Louisiana Tech


Attached File(s)
.jpeg  Joe Aillet Stadium-2015B.jpeg (Size: 124.96 KB / Downloads: 63)
02-09-2016 07:47 PM
Find all posts by this user
cr11owl Offline
All American
*

Posts: 4,717
Joined: Feb 2009
Reputation: 29
I Root For: Rice
Location:
Post: #169
RE: Conference USA Facilities
http://www.riceowls.com/view.gal?id=189516

Update on our EZF. Interior renderings. Going to be pretty nice for the players going from locker rooms with mold and no hot water to this. Should be done before fall!
03-14-2016 01:48 PM
Find all posts by this user
Collin_Ellis Offline
2nd String
*

Posts: 281
Joined: Aug 2015
Reputation: 12
I Root For: Tech
Location:
Post: #170
RE: Conference USA Facilities
Louisiana Tech will begin construction on a new Press Box/Suites after 2017 season. There will also be some bathroom and concourse renovations associated with new construction.
05-03-2016 11:59 AM
Find all posts by this user
eager eagle Offline
All American
*

Posts: 2,893
Joined: Jan 2004
Reputation: 6
I Root For:
Location:
Post: #171
RE: Conference USA Facilities
(05-03-2016 11:59 AM)Collin_Ellis Wrote:  Louisiana Tech will begin construction on a new Press Box/Suites after 2017 season. There will also be some bathroom and concourse renovations associated with new construction.

Louisiana Tech submitted plans to the Board of Supervisors for their approval but wont be able to begin construction until they money is raised. They solicited funds for over three years for their end zone bldg and finally had to induce the students to vote a fee upon themselves in order to issue bonds to cover over half the cost which the students will be paying off now over the next 22-23yrs. Probably wont be able to get them to give any more so its wait and see as to whether the fans will pony up for this project.
05-09-2016 03:40 PM
Find all posts by this user
winston70 Offline
All American
*

Posts: 4,823
Joined: May 2012
Reputation: 116
I Root For: La Tech
Location:
Post: #172
RE: Conference USA Facilities
(05-09-2016 03:40 PM)eager eagle Wrote:  
(05-03-2016 11:59 AM)Collin_Ellis Wrote:  Louisiana Tech will begin construction on a new Press Box/Suites after 2017 season. There will also be some bathroom and concourse renovations associated with new construction.

Louisiana Tech submitted plans to the Board of Supervisors for their approval but wont be able to begin construction until they money is raised. They solicited funds for over three years for their end zone bldg and finally had to induce the students to vote a fee upon themselves in order to issue bonds to cover over half the cost which the students will be paying off now over the next 22-23yrs. Probably wont be able to get them to give any more so its wait and see as to whether the fans will pony up for this project.


Most of the funding for this project is already in hand and it is very likely to start construction after the end of the 2016 season. They have decided to see how much additional money they can get to improve the final product. The endzone project was originally 18 million but finished at 22 million with upgraded/additional interior upgrades.
05-09-2016 09:32 PM
Find all posts by this user
eager eagle Offline
All American
*

Posts: 2,893
Joined: Jan 2004
Reputation: 6
I Root For:
Location:
Post: #173
RE: Conference USA Facilities
(05-09-2016 09:32 PM)winston70 Wrote:  
(05-09-2016 03:40 PM)eager eagle Wrote:  
(05-03-2016 11:59 AM)Collin_Ellis Wrote:  Louisiana Tech will begin construction on a new Press Box/Suites after 2017 season. There will also be some bathroom and concourse renovations associated with new construction.

Louisiana Tech submitted plans to the Board of Supervisors for their approval but wont be able to begin construction until they money is raised. They solicited funds for over three years for their end zone bldg and finally had to induce the students to vote a fee upon themselves in order to issue bonds to cover over half the cost which the students will be paying off now over the next 22-23yrs. Probably wont be able to get them to give any more so its wait and see as to whether the fans will pony up for this project.



Most of the funding for this project is already in hand and it is very likely to start construction after the end of the 2016 season. They have decided to see how much additional money they can get to improve the final product. The endzone project was originally 18 million but finished at 22 million with upgraded/additional interior upgrades.

Must be a heavy hitter booster in the background on this as there has been no public announcement of fund raising, etc. If Tech relies on their general fan base for the money then you are looking at several years, if history repeats itself. Remember it took 3yrs or so to raise the $9mil added to the student bond issue to get the SEZ project completed. The STRUCTURE for that end zone project cost $14mil. If the new add ons can garner that much money then they should be able to make it look good.
(This post was last modified: 05-10-2016 09:29 AM by eager eagle.)
05-10-2016 09:23 AM
Find all posts by this user
winston70 Offline
All American
*

Posts: 4,823
Joined: May 2012
Reputation: 116
I Root For: La Tech
Location:
Post: #174
RE: Conference USA Facilities
(05-10-2016 09:23 AM)eager eagle Wrote:  
(05-09-2016 09:32 PM)winston70 Wrote:  
(05-09-2016 03:40 PM)eager eagle Wrote:  
(05-03-2016 11:59 AM)Collin_Ellis Wrote:  Louisiana Tech will begin construction on a new Press Box/Suites after 2017 season. There will also be some bathroom and concourse renovations associated with new construction.

Louisiana Tech submitted plans to the Board of Supervisors for their approval but wont be able to begin construction until they money is raised. They solicited funds for over three years for their end zone bldg and finally had to induce the students to vote a fee upon themselves in order to issue bonds to cover over half the cost which the students will be paying off now over the next 22-23yrs. Probably wont be able to get them to give any more so its wait and see as to whether the fans will pony up for this project.



Most of the funding for this project is already in hand and it is very likely to start construction after the end of the 2016 season. They have decided to see how much additional money they can get to improve the final product. The endzone project was originally 18 million but finished at 22 million with upgraded/additional interior upgrades.

Must be a heavy hitter booster in the background on this as there has been no public announcement of fund raising, etc. If Tech relies on their general fan base for the money then you are looking at several years, if history repeats itself. Remember it took 3yrs or so to raise the $9mil added to the student bond issue to get the SEZ project completed. The STRUCTURE for that end zone project cost $14mil. If the new add ons can garner that much money then they should be able to make it look good.

Yep and your numbers are off on the endzone deal. This is my last reply to you here so post away to yourself if you want.
05-10-2016 08:41 PM
Find all posts by this user
eager eagle Offline
All American
*

Posts: 2,893
Joined: Jan 2004
Reputation: 6
I Root For:
Location:
Post: #175
RE: Conference USA Facilities
(05-10-2016 08:41 PM)winston70 Wrote:  
(05-10-2016 09:23 AM)eager eagle Wrote:  
(05-09-2016 09:32 PM)winston70 Wrote:  
(05-09-2016 03:40 PM)eager eagle Wrote:  
(05-03-2016 11:59 AM)Collin_Ellis Wrote:  Louisiana Tech will begin construction on a new Press Box/Suites after 2017 season. There will also be some bathroom and concourse renovations associated with new construction.

Louisiana Tech submitted plans to the Board of Supervisors for their approval but wont be able to begin construction until they money is raised. They solicited funds for over three years for their end zone bldg and finally had to induce the students to vote a fee upon themselves in order to issue bonds to cover over half the cost which the students will be paying off now over the next 22-23yrs. Probably wont be able to get them to give any more so its wait and see as to whether the fans will pony up for this project.



Most of the funding for this project is already in hand and it is very likely to start construction after the end of the 2016 season. They have decided to see how much additional money they can get to improve the final product. The endzone project was originally 18 million but finished at 22 million with upgraded/additional interior upgrades.

Must be a heavy hitter booster in the background on this as there has been no public announcement of fund raising, etc. If Tech relies on their general fan base for the money then you are looking at several years, if history repeats itself. Remember it took 3yrs or so to raise the $9mil added to the student bond issue to get the SEZ project completed. The STRUCTURE for that end zone project cost $14mil. If the new add ons can garner that much money then they should be able to make it look good.

Yep and your numbers are off on the endzone deal. This is my last reply to you here so post away to yourself if you want.

The only numbers I mentioned regarding the end zone project was the STRUCTURE cost $14mil and that is a FACT. That DOES NOT include furnishings, insurance, landscaping, new parking, reserves, etc which can be stretched out into infinity. The info on fund raising and financing is a FACT. So, what numbers are you thinking about that are off. You obviously had rather believe "hearsay" than actual documented details between the Board of Supervisors and the Tech administration.
(This post was last modified: 05-11-2016 08:26 AM by eager eagle.)
05-11-2016 08:13 AM
Find all posts by this user
HogDawg Offline
Heisman
*

Posts: 7,354
Joined: Dec 2003
Reputation: 549
I Root For: LA Tech
Location: FranklinTNMcKinneyTX
Post: #176
RE: Conference USA Facilities
(05-11-2016 08:13 AM)eager eagle Wrote:  
(05-10-2016 08:41 PM)winston70 Wrote:  
(05-10-2016 09:23 AM)eager eagle Wrote:  
(05-09-2016 09:32 PM)winston70 Wrote:  
(05-09-2016 03:40 PM)eager eagle Wrote:  Louisiana Tech submitted plans to the Board of Supervisors for their approval but wont be able to begin construction until they money is raised. They solicited funds for over three years for their end zone bldg and finally had to induce the students to vote a fee upon themselves in order to issue bonds to cover over half the cost which the students will be paying off now over the next 22-23yrs. Probably wont be able to get them to give any more so its wait and see as to whether the fans will pony up for this project.

Most of the funding for this project is already in hand and it is very likely to start construction after the end of the 2016 season. They have decided to see how much additional money they can get to improve the final product. The endzone project was originally 18 million but finished at 22 million with upgraded/additional interior upgrades.

Must be a heavy hitter booster in the background on this as there has been no public announcement of fund raising, etc. If Tech relies on their general fan base for the money then you are looking at several years, if history repeats itself. Remember it took 3yrs or so to raise the $9mil added to the student bond issue to get the SEZ project completed. The STRUCTURE for that end zone project cost $14mil. If the new add ons can garner that much money then they should be able to make it look good.

Yep and your numbers are off on the endzone deal. This is my last reply to you here so post away to yourself if you want.

The only numbers I mentioned regarding the end zone project was the STRUCTURE cost $14mil and that is a FACT. That DOES NOT include furnishings, insurance, landscaping, new parking, reserves, etc which can be stretched out into infinity. The info on fund raising and financing is a FACT. So, what numbers are you thinking about that are off. You obviously had rather believe "hearsay" than actual documented details between the Board of Supervisors and the Tech administration.

If you want to see something funny, click on EE's "reputation" points. LOL! 13 of his last 15 reps came from "LACajunsFan" with the other two coming from Herd fan "Thunderground". Was there ever any doubt about EE being a UL-Laughyette fan? 03-lmfao That's just sad.
(This post was last modified: 05-13-2016 11:28 AM by HogDawg.)
05-13-2016 11:25 AM
Find all posts by this user
eager eagle Offline
All American
*

Posts: 2,893
Joined: Jan 2004
Reputation: 6
I Root For:
Location:
Post: #177
RE: Conference USA Facilities
(05-13-2016 11:25 AM)HogDawg Wrote:  
(05-11-2016 08:13 AM)eager eagle Wrote:  
(05-10-2016 08:41 PM)winston70 Wrote:  
(05-10-2016 09:23 AM)eager eagle Wrote:  
(05-09-2016 09:32 PM)winston70 Wrote:  Most of the funding for this project is already in hand and it is very likely to start construction after the end of the 2016 season. They have decided to see how much additional money they can get to improve the final product. The endzone project was originally 18 million but finished at 22 million with upgraded/additional interior upgrades.

Must be a heavy hitter booster in the background on this as there has been no public announcement of fund raising, etc. If Tech relies on their general fan base for the money then you are looking at several years, if history repeats itself. Remember it took 3yrs or so to raise the $9mil added to the student bond issue to get the SEZ project completed. The STRUCTURE for that end zone project cost $14mil. If the new add ons can garner that much money then they should be able to make it look good.

Yep and your numbers are off on the endzone deal. This is my last reply to you here so post away to yourself if you want.

The only numbers I mentioned regarding the end zone project was the STRUCTURE cost $14mil and that is a FACT. That DOES NOT include furnishings, insurance, landscaping, new parking, reserves, etc which can be stretched out into infinity. The info on fund raising and financing is a FACT. So, what numbers are you thinking about that are off. You obviously had rather believe "hearsay" than actual documented details between the Board of Supervisors and the Tech administration.

If you want to see something funny, click on EE's "reputation" points. LOL! 13 of his last 15 reps came from "LACajunsFan" with the other two coming from Herd fan "Thunderground". Was there ever any doubt about EE being a UL-Laughyette fan? 03-lmfao That's just sad.

What would being a UL Lafayette fan have to do with the cost of Techs end zone project? That cost was administered by the Tech administration, the contractor, the Board of Supervisors, and the Board of Regents. Also, if anyone checks my "reputation" points as you suggest be sure to look at the negatives posted by the boys from Dogpatch.
05-13-2016 06:03 PM
Find all posts by this user
winston70 Offline
All American
*

Posts: 4,823
Joined: May 2012
Reputation: 116
I Root For: La Tech
Location:
Post: #178
RE: Conference USA Facilities
(05-13-2016 06:03 PM)eager eagle Wrote:  
(05-13-2016 11:25 AM)HogDawg Wrote:  
(05-11-2016 08:13 AM)eager eagle Wrote:  
(05-10-2016 08:41 PM)winston70 Wrote:  
(05-10-2016 09:23 AM)eager eagle Wrote:  Must be a heavy hitter booster in the background on this as there has been no public announcement of fund raising, etc. If Tech relies on their general fan base for the money then you are looking at several years, if history repeats itself. Remember it took 3yrs or so to raise the $9mil added to the student bond issue to get the SEZ project completed. The STRUCTURE for that end zone project cost $14mil. If the new add ons can garner that much money then they should be able to make it look good.

Yep and your numbers are off on the endzone deal. This is my last reply to you here so post away to yourself if you want.

The only numbers I mentioned regarding the end zone project was the STRUCTURE cost $14mil and that is a FACT. That DOES NOT include furnishings, insurance, landscaping, new parking, reserves, etc which can be stretched out into infinity. The info on fund raising and financing is a FACT. So, what numbers are you thinking about that are off. You obviously had rather believe "hearsay" than actual documented details between the Board of Supervisors and the Tech administration.

If you want to see something funny, click on EE's "reputation" points. LOL! 13 of his last 15 reps came from "LACajunsFan" with the other two coming from Herd fan "Thunderground". Was there ever any doubt about EE being a UL-Laughyette fan? 03-lmfao That's just sad.

What would being a UL Lafayette fan have to do with the cost of Techs end zone project? That cost was administered by the Tech administration, the contractor, the Board of Supervisors, and the Board of Regents. Also, if anyone checks my "reputation" points as you suggest be sure to look at the negatives posted by the boys from Dogpatch.

Negative Rep points from Tech fans - that's really a shocker 04-jawdrop
05-16-2016 08:32 AM
Find all posts by this user
eager eagle Offline
All American
*

Posts: 2,893
Joined: Jan 2004
Reputation: 6
I Root For:
Location:
Post: #179
RE: Conference USA Facilities
(05-16-2016 08:32 AM)winston70 Wrote:  
(05-13-2016 06:03 PM)eager eagle Wrote:  
(05-13-2016 11:25 AM)HogDawg Wrote:  
(05-11-2016 08:13 AM)eager eagle Wrote:  
(05-10-2016 08:41 PM)winston70 Wrote:  Yep and your numbers are off on the endzone deal. This is my last reply to you here so post away to yourself if you want.

The only numbers I mentioned regarding the end zone project was the STRUCTURE cost $14mil and that is a FACT. That DOES NOT include furnishings, insurance, landscaping, new parking, reserves, etc which can be stretched out into infinity. The info on fund raising and financing is a FACT. So, what numbers are you thinking about that are off. You obviously had rather believe "hearsay" than actual documented details between the Board of Supervisors and the Tech administration.

If you want to see something funny, click on EE's "reputation" points. LOL! 13 of his last 15 reps came from "LACajunsFan" with the other two coming from Herd fan "Thunderground". Was there ever any doubt about EE being a UL-Laughyette fan? 03-lmfao That's just sad.

What would being a UL Lafayette fan have to do with the cost of Techs end zone project? That cost was administered by the Tech administration, the contractor, the Board of Supervisors, and the Board of Regents. Also, if anyone checks my "reputation" points as you suggest be sure to look at the negatives posted by the boys from Dogpatch.

Negative Rep points from Tech fans - that's really a shocker 04-jawdrop

But think how great my grades would be if not for all the "F"s bestowed upon me by the boys from Dogpatch. I could be on the deans list and honor roll.
(This post was last modified: 05-17-2016 10:23 AM by eager eagle.)
05-17-2016 10:22 AM
Find all posts by this user
HogDawg Offline
Heisman
*

Posts: 7,354
Joined: Dec 2003
Reputation: 549
I Root For: LA Tech
Location: FranklinTNMcKinneyTX
Post: #180
RE: Conference USA Facilities
(05-17-2016 10:22 AM)eager eagle Wrote:  
(05-16-2016 08:32 AM)winston70 Wrote:  
(05-13-2016 06:03 PM)eager eagle Wrote:  
(05-13-2016 11:25 AM)HogDawg Wrote:  
(05-11-2016 08:13 AM)eager eagle Wrote:  The only numbers I mentioned regarding the end zone project was the STRUCTURE cost $14mil and that is a FACT. That DOES NOT include furnishings, insurance, landscaping, new parking, reserves, etc which can be stretched out into infinity. The info on fund raising and financing is a FACT. So, what numbers are you thinking about that are off. You obviously had rather believe "hearsay" than actual documented details between the Board of Supervisors and the Tech administration.

If you want to see something funny, click on EE's "reputation" points. LOL! 13 of his last 15 reps came from "LACajunsFan" with the other two coming from Herd fan "Thunderground". Was there ever any doubt about EE being a UL-Laughyette fan? 03-lmfao That's just sad.

What would being a UL Lafayette fan have to do with the cost of Techs end zone project? That cost was administered by the Tech administration, the contractor, the Board of Supervisors, and the Board of Regents. Also, if anyone checks my "reputation" points as you suggest be sure to look at the negatives posted by the boys from Dogpatch.

Negative Rep points from Tech fans - that's really a shocker 04-jawdrop

But think how great my grades would be if not for all the "F"s bestowed upon me by the boys from Dogpatch. I could be on the deans list and honor roll.
Just think how great your grades would be if you weren't a prevaricating con artist spending your entire life pretending to be a USM fan that fabricates deceitfulness and dishonesty about LA Tech.
05-20-2016 03:05 PM
Find all posts by this user
Thread Closed 




User(s) browsing this thread: 1 Guest(s)


Copyright © 2002-2024 Collegiate Sports Nation Bulletin Board System (CSNbbs), All Rights Reserved.
CSNbbs is an independent fan site and is in no way affiliated to the NCAA or any of the schools and conferences it represents.
This site monetizes links. FTC Disclosure.
We allow third-party companies to serve ads and/or collect certain anonymous information when you visit our web site. These companies may use non-personally identifiable information (e.g., click stream information, browser type, time and date, subject of advertisements clicked or scrolled over) during your visits to this and other Web sites in order to provide advertisements about goods and services likely to be of greater interest to you. These companies typically use a cookie or third party web beacon to collect this information. To learn more about this behavioral advertising practice or to opt-out of this type of advertising, you can visit http://www.networkadvertising.org.
Powered By MyBB, © 2002-2024 MyBB Group.