Hello There, Guest! (LoginRegister)

Post Reply 
D-Hub
Author Message
Bookmark and Share
Centdukesfan Offline
All American
*

Posts: 3,499
Joined: Apr 2013
Reputation: 82
I Root For: Dukes, bud
Location:
Post: #121
RE: D-Hub
Just keep buffalo mash
08-02-2016 09:19 AM
Find all posts by this user Quote this message in a reply
chicagoduke Offline
2nd String
*

Posts: 460
Joined: Jan 2014
Reputation: 19
I Root For: Dukes
Location: Chicago
Post: #122
RE: D-Hub
I hope they give it a serious redesign and a completely new look. I feel strongly that every building north of the train tracks should have some sort of Bluestone incorporated into the design.
08-02-2016 09:52 AM
Find all posts by this user Quote this message in a reply
Longhorn Offline
Hall of Famer
*

Posts: 11,399
Joined: Oct 2012
Reputation: 97
I Root For: JMU
Location:
Post: #123
RE: D-Hub
(08-02-2016 09:02 AM)Deez Nuts Wrote:  A week or two ago, JMU issued an RFP for Architecture/Engineering services for the demolition and reconstruction of an expanded PC Dukes/Phillips Hall, so I guess that's now become an official JMU project. The pitch was that since Aramark built D-Hub to offset the need for food service while D-Hall was being replaced, it would be in the best financial interest to go ahead and do Phillips Hall while a suitable temporary dining solution was already in place. So D-Hub replaces D-Hall for school years 2016 and 2017, then when D-Hall is done PC Dukes will close for demolition and reconstruction in 2018 and 2019. Somewhere in there the CoB project will probably kick off, requiring the demolition of Chandler hall (and Mrs Greens), and that appears to be slated to begin in summer 2018.

JMU Dining is going to have some nice options over the coming years.

Sounds like a thoughtful logistical plan. And to those of us hoping for traces of bluestone, I think based on the new D-Hall's design, we'll see the replacement for PC Dukes exhibit a similar nod to bluestone.
08-02-2016 10:50 AM
Find all posts by this user Quote this message in a reply
ParentofJMUMRDs Offline
Heisman
*

Posts: 5,807
Joined: Apr 2013
Reputation: 56
I Root For: JMU
Location: State of Confusion
Post: #124
RE: D-Hub
They are really breaking up a lot of rock at D Hall. Have 4 of the rock breakers going!!

Brian
08-02-2016 10:51 AM
Find all posts by this user Quote this message in a reply
JMUTrippster Offline
Special Teams
*

Posts: 739
Joined: Apr 2013
Reputation: 2
I Root For: JMU
Location: RVA
Post: #125
RE: D-Hub
(08-02-2016 10:50 AM)Longhorn Wrote:  
(08-02-2016 09:02 AM)Deez Nuts Wrote:  A week or two ago, JMU issued an RFP for Architecture/Engineering services for the demolition and reconstruction of an expanded PC Dukes/Phillips Hall, so I guess that's now become an official JMU project. The pitch was that since Aramark built D-Hub to offset the need for food service while D-Hall was being replaced, it would be in the best financial interest to go ahead and do Phillips Hall while a suitable temporary dining solution was already in place. So D-Hub replaces D-Hall for school years 2016 and 2017, then when D-Hall is done PC Dukes will close for demolition and reconstruction in 2018 and 2019. Somewhere in there the CoB project will probably kick off, requiring the demolition of Chandler hall (and Mrs Greens), and that appears to be slated to begin in summer 2018.

JMU Dining is going to have some nice options over the coming years.

Sounds like a thoughtful logistical plan. And to those of us hoping for traces of bluestone, I think based on the new D-Hall's design, we'll see the replacement for PC Dukes exhibit a similar nod to bluestone.

Agreed, makes way more sense to knock out the other dining establishments while D-Hub is in place to keep the pressure off the renovated D-Hall. My understanding is that D-Hub has some to-go options like what would have been at PC Dukes/Top Dog.
08-02-2016 11:28 AM
Find all posts by this user Quote this message in a reply
ParentofJMUMRDs Offline
Heisman
*

Posts: 5,807
Joined: Apr 2013
Reputation: 56
I Root For: JMU
Location: State of Confusion
Post: #126
RE: D-Hub
Looking forward to checking out D Hub during football season.

Brian
08-02-2016 01:39 PM
Find all posts by this user Quote this message in a reply
JMUsince89 Offline
1st String
*

Posts: 1,263
Joined: Apr 2013
Reputation: 21
I Root For: JMU Dukes
Location:
Post: #127
RE: D-Hub
D-Hub has outside walkup locations for foods like PC Dukes does. The inside seating area is large but not anywhere near as big as D-Hall was it is a big open dining area.
08-03-2016 09:10 AM
Find all posts by this user Quote this message in a reply
JMUTrippster Offline
Special Teams
*

Posts: 739
Joined: Apr 2013
Reputation: 2
I Root For: JMU
Location: RVA
Post: #128
RE: D-Hub
(08-03-2016 09:10 AM)JMUsince89 Wrote:  D-Hub has outside walkup locations for foods like PC Dukes does. The inside seating area is large but not anywhere near as big as D-Hall was it is a big open dining area.

I am pretty sure I read that it actually has more seating than dhall did. Remember the layout in dhall was rather broken up.
08-03-2016 01:13 PM
Find all posts by this user Quote this message in a reply
JMUsince89 Offline
1st String
*

Posts: 1,263
Joined: Apr 2013
Reputation: 21
I Root For: JMU Dukes
Location:
Post: #129
RE: D-Hub
It is a big open area. D-hall had MarketOne, Chic-O-Olay, and the reg D-hall seating. Yes it was broken up a bit just looked like it was larger. I walked the old D-Hall area this afternoon inside the fence, it's amazing how much ground that building took up. Lots of rock busting going on.
08-03-2016 03:53 PM
Find all posts by this user Quote this message in a reply
Deez Nuts Online
Moderator. Go Dukes!
*

Posts: 7,438
Joined: Apr 2013
Reputation: 100
I Root For: the Dukes
Location:
Post: #130
RE: D-Hub
I would have to think we're getting close to final D-Hole status. The site is pretty well leveled out now from front to back, but I don't know if they have to go deeper or not. Still working in the Carrier Library corner of the site to bring it down but they're close to level all across.
08-18-2016 10:01 AM
Find all posts by this user Quote this message in a reply
JMUTrippster Offline
Special Teams
*

Posts: 739
Joined: Apr 2013
Reputation: 2
I Root For: JMU
Location: RVA
Post: #131
RE: D-Hub
(08-18-2016 10:01 AM)Deez Nuts Wrote:  I would have to think we're getting close to final D-Hole status. The site is pretty well leveled out now from front to back, but I don't know if they have to go deeper or not. Still working in the Carrier Library corner of the site to bring it down but they're close to level all across.

Looks like from the webcam that they have pretty much every machine focusing on that corner. I would guess they'd be working elsewhere if they needed to go lower...but I sit at a desk all day so I don't know.
08-18-2016 11:18 AM
Find all posts by this user Quote this message in a reply
Potomac Offline
Hall of Famer
*

Posts: 12,732
Joined: Apr 2013
Reputation: 59
I Root For: James Madison
Location:
Post: #132
RE: D-Hub
OT for this thread but I didn't want to start a new thread just to ask this question.

Is the entire North Campus area now completed? I know they haven't completed the convention center and hotel, but is that all that remains to be done?
08-18-2016 11:57 AM
Find all posts by this user Quote this message in a reply
Deez Nuts Online
Moderator. Go Dukes!
*

Posts: 7,438
Joined: Apr 2013
Reputation: 100
I Root For: the Dukes
Location:
Post: #133
RE: D-Hub
Madison Hall (former RMH Cancer Center) is currently under renovation and done next spring. Hotel and Conference Center is beginning... though I guess that could be considered North Campus. The parking deck is open, and the CHBS building is done; staff making a fast move into the building now with classes starting in 2 weeks. The facade of the health center got a makeover this summer. Overall... yeah just about done.
08-18-2016 12:55 PM
Find all posts by this user Quote this message in a reply
Longhorn Offline
Hall of Famer
*

Posts: 11,399
Joined: Oct 2012
Reputation: 97
I Root For: JMU
Location:
Post: #134
RE: D-Hub
(08-18-2016 12:55 PM)Deez Nuts Wrote:  Madison Hall (former RMH Cancer Center) is currently under renovation and done next spring. Hotel and Conference Center is beginning... though I guess that could be considered North Campus. The parking deck is open, and the CHBS building is done; staff making a fast move into the building now with classes starting in 2 weeks. The facade of the health center got a makeover this summer. Overall... yeah just about done.

Until they start the expansion on the back side of Carrier Library, and the construction of an art museum on the footprint of Anthony-Seeger.
08-18-2016 05:28 PM
Find all posts by this user Quote this message in a reply
Dukes 92 Offline
Water Engineer
*

Posts: 97
Joined: May 2013
Reputation: 0
I Root For: JMU
Location:
Post: #135
RE: D-Hub
nowhere near "done". Here is the link for the 2016-2022 capital outlay plan for new projects, a couple already assigned a State project #. Of course you have to get the state to approve the appropriations as part of the budget process, but clearly we are nowhere close to done in regards to infrastructure all over campus....just wish there was a line item for Bridgeforth expansion phase III. But maybe that is part of the Athletics Administration Building???? Ambitious and maybe even audacious to think we will spend a billion dollars over the next six years (which does not include the cost of the convo 89m, dining hall 81m, new Phillips replacement 35m, and student housing project which has a $55m price tag which may be grace street phase II or on CISAT side). https://www.jmu.edu/jmuplans/supporting-...-2022.pdf. Enjoy.
(This post was last modified: 08-19-2016 03:19 PM by Dukes 92.)
08-19-2016 07:57 AM
Find all posts by this user Quote this message in a reply
JMUsince89 Offline
1st String
*

Posts: 1,263
Joined: Apr 2013
Reputation: 21
I Root For: JMU Dukes
Location:
Post: #136
RE: D-Hub
Port Road Ath Admin bldg is the new one for soccer,lacross,feildhockey,track&field lockerrooms and offices at Port rd Athlectics park.
08-19-2016 08:14 AM
Find all posts by this user Quote this message in a reply
Deez Nuts Online
Moderator. Go Dukes!
*

Posts: 7,438
Joined: Apr 2013
Reputation: 100
I Root For: the Dukes
Location:
Post: #137
RE: D-Hub
(08-19-2016 07:57 AM)Dukes 92 Wrote:  niwhere near "done". Here is the link for the 2016-2022 capital outlay plan for new projects, a couple already assigned a State project #. Of course you have to get the state to approve the appropriations as part of the budget process, but clearly we are nowhere close to done in regards to infrastructure all over campus....just wish there was a line item for Bridgeforth expansion phase III. But maybe that is part of the Athletics Administration Building???? Ambitious and maybe even audacious to think we will spend a billion dollars over the next six years (which does not include the cost of the convo 89m, dining hall 81m, new Phillips replacement 35m, and student housing project which has a $55m price tag which may be grace street phase II or on CISAT side). https://www.jmu.edu/jmuplans/supporting-...-2022.pdf. Enjoy.

nice. save dat money.
08-19-2016 10:46 AM
Find all posts by this user Quote this message in a reply
JMUTrippster Offline
Special Teams
*

Posts: 739
Joined: Apr 2013
Reputation: 2
I Root For: JMU
Location: RVA
Post: #138
RE: D-Hub
Looks like we have maybe some markings for footings? It's impressive how quickly they cleared that area!
08-25-2016 08:34 AM
Find all posts by this user Quote this message in a reply
jwblue Offline
Water Engineer
*

Posts: 15
Joined: Jul 2013
Reputation: 0
I Root For: James Madison
Location:
Post: #139
RE: D-Hub
(08-03-2016 01:13 PM)JMUTrippster Wrote:  
(08-03-2016 09:10 AM)JMUsince89 Wrote:  D-Hub has outside walkup locations for foods like PC Dukes does. The inside seating area is large but not anywhere near as big as D-Hall was it is a big open dining area.

I am pretty sure I read that it actually has more seating than dhall did. Remember the layout in dhall was rather broken up.


I was going to ask if D-hub was big enough. Initially I thought no way.

Can anyone eat at D-Hub? Is there an area for people that are not students to eat?

I would love to see pictures of inside D-Hub.

Is the food going to be the same as what was served at D-Hall?
(This post was last modified: 08-31-2016 01:34 AM by jwblue.)
08-31-2016 01:19 AM
Find all posts by this user Quote this message in a reply
jmuroadwarrior Offline
1st String
*

Posts: 2,074
Joined: May 2013
Reputation: 20
I Root For: JMU albany
Location: Harrisonburg
Post: #140
RE: D-Hub
Maybe this is old news but I hadn't noticed before last week. There is designated Food Truck parking up the hill from the D Hall site, in one of those parking lots sort of behind Wilson, freshly paved and striped for food truck parking.
08-31-2016 06:36 AM
Find all posts by this user Quote this message in a reply
Post Reply 




User(s) browsing this thread: 1 Guest(s)


Copyright © 2002-2024 Collegiate Sports Nation Bulletin Board System (CSNbbs), All Rights Reserved.
CSNbbs is an independent fan site and is in no way affiliated to the NCAA or any of the schools and conferences it represents.
This site monetizes links. FTC Disclosure.
We allow third-party companies to serve ads and/or collect certain anonymous information when you visit our web site. These companies may use non-personally identifiable information (e.g., click stream information, browser type, time and date, subject of advertisements clicked or scrolled over) during your visits to this and other Web sites in order to provide advertisements about goods and services likely to be of greater interest to you. These companies typically use a cookie or third party web beacon to collect this information. To learn more about this behavioral advertising practice or to opt-out of this type of advertising, you can visit http://www.networkadvertising.org.
Powered By MyBB, © 2002-2024 MyBB Group.