RE: ODU Master Plan
(03-20-2023 12:45 PM)Monarchist13 Wrote: (03-20-2023 12:30 PM)12thmonarch Wrote: (03-20-2023 12:08 PM)cbank Wrote: Havent seen any discussion on it yet but it seems that the Maglev is coming down
https://www.bidnetdirect.com/public/supp...1&origin=1
Some fond memories with that thin umbrella that ran through the campus. I liked how it stood as a solid concrete banner for PR on the Hampton Blvd. I am gonna miss that.
Apparently this is not a done deal yet. Engineering students use the test track, the school does like the portion that goes over Hampton Blvd and the SGA likes its' use as part of art installations. So there is a possibility that a portion of it will be preserved. However, portions of it have to come down for the construction of the new Biology building.
That would be great. Lets hope that happens.
|
|
| 03-20-2023 01:32 PM |
|
Blue_Trombone
Heisman

Posts: 8,666
Joined: Nov 2011
Reputation: 533
I Root For: Old Dominion
Location:
|
RE: ODU Master Plan
(03-20-2023 12:02 PM)cbank Wrote: To everyone (including myself) that was hoping for a demolition of the NEZ anytime soon, it seems that the university will eb giving it life
(https://mvendor.cgieva.com/Vendor/public...id_round=3
I mean, while it does mean this won't happen next year, I would say that a project to increase the life of a structure to only 5-10 years more is pretty paltry. So I would say that if we wanted a prospective start date to construction it might be around 5-10 years from now
|
|
| 03-20-2023 01:37 PM |
|
monarx
Hall of Famer

Posts: 18,519
Joined: May 2012
Reputation: 419
I Root For: ODU
Location:
|
RE: ODU Master Plan
(03-20-2023 01:37 PM)Blue_Trombone Wrote: (03-20-2023 12:02 PM)cbank Wrote: To everyone (including myself) that was hoping for a demolition of the NEZ anytime soon, it seems that the university will eb giving it life
(https://mvendor.cgieva.com/Vendor/public...id_round=3
I mean, while it does mean this won't happen next year, I would say that a project to increase the life of a structure to only 5-10 years more is pretty paltry. So I would say that if we wanted a prospective start date to construction it might be around 5-10 years from now
I’m glad they put in the 5-10 years part. I’d be pretty bummed if that eyesore is still there in 6-7 years. Maybe they are using all the Jones savings to save up for the NEZ and baseball stadium.
|
|
| 03-20-2023 02:44 PM |
|
ODUODUODU
1st String

Posts: 1,865
Joined: May 2017
Reputation: 131
I Root For: ODU
Location:
|
RE: ODU Master Plan
Heinicke to Pascal North End Zone Party Zone!!!
|
|
| 03-22-2023 10:10 AM |
|
Monarchist13
Moderator

Posts: 20,404
Joined: May 2012
Reputation: 531
I Root For: ODU
Location: 757
|
|
| 04-19-2023 03:43 PM |
|
monarx
Hall of Famer

Posts: 18,519
Joined: May 2012
Reputation: 419
I Root For: ODU
Location:
|
RE: ODU Master Plan
(04-19-2023 03:43 PM)Monarchist13 Wrote:
Link: https://twitter.com/vafreeclinics/status...10209?s=20
Something for us all to be proud of.
It really is. This is the kind of thing that makes a real world difference in peoples lives, and in the reputation and mission of the school. Hope to see more of these mobile units out and about, and eventually brick and mortar facilities. Good work ODU/Dr. Hemphill.
|
|
| 04-19-2023 03:51 PM |
|
MonarchManiac
Heisman

Posts: 6,441
Joined: May 2012
Reputation: 254
I Root For: Old Dominion
Location: Norfolk, VA
|
RE: ODU Master Plan
(04-19-2023 03:51 PM)monarx Wrote: (04-19-2023 03:43 PM)Monarchist13 Wrote:
Link: https://twitter.com/vafreeclinics/status...10209?s=20
Something for us all to be proud of.
It really is. This is the kind of thing that makes a real world difference in peoples lives, and in the reputation and mission of the school. Hope to see more of these mobile units out and about, and eventually brick and mortar facilities. Good work ODU/Dr. Hemphill.

|
|
| 04-19-2023 07:27 PM |
|
Sithlord
Special Teams

Posts: 542
Joined: May 2012
Reputation: 15
I Root For: ODU
Location:
|
RE: ODU Master Plan
So I just received some info about scholarship money provided by ODU and a comparable school FecesU (yuk). A good friend (local to the 757) said that their child received 6k in merit scholarship money from ODU and 11k in merit scholarship money from VCU. Estimated yearly costs with housing for ODU are about 21k and VCU is 24k. College acceptance day just passed so the child chose VCU.
I know out of pocket costs are close but why are we getting outbid on that front?
|
|
| 05-04-2023 02:51 PM |
|
Monarchist13
Moderator

Posts: 20,404
Joined: May 2012
Reputation: 531
I Root For: ODU
Location: 757
|
RE: ODU Master Plan
(05-04-2023 02:51 PM)Sithlord Wrote: So I just received some info about scholarship money provided by ODU and a comparable school FecesU (yuk). A good friend (local to the 757) said that their child received 6k in merit scholarship money from ODU and 11k in merit scholarship money from VCU. Estimated yearly costs with housing for ODU are about 21k and VCU is 24k. College acceptance day just passed so the child chose VCU.
I know out of pocket costs are close but why are we getting outbid on that front?
The student chose the school that will cost them less. A completely understandable decision but this is a one-off situation that no one can draw any real conclusions from other than that family. The merit money offered isn't universal, it changes from student to student.
(This post was last modified: 05-04-2023 03:13 PM by Monarchist13.)
|
|
| 05-04-2023 03:12 PM |
|
ODURallyFox
All American

Posts: 4,275
Joined: Dec 2022
Reputation: 45
I Root For: ODU
Location:
|
RE: ODU Master Plan
(03-20-2023 02:44 PM)monarx Wrote: (03-20-2023 01:37 PM)Blue_Trombone Wrote: (03-20-2023 12:02 PM)cbank Wrote: To everyone (including myself) that was hoping for a demolition of the NEZ anytime soon, it seems that the university will eb giving it life
(https://mvendor.cgieva.com/Vendor/public...id_round=3
I mean, while it does mean this won't happen next year, I would say that a project to increase the life of a structure to only 5-10 years more is pretty paltry. So I would say that if we wanted a prospective start date to construction it might be around 5-10 years from now
I’m glad they put in the 5-10 years part. I’d be pretty bummed if that eyesore is still there in 6-7 years. Maybe they are using all the Jones savings to save up for the NEZ and baseball stadium.
Our north endzone is a disgrace. We need a new locker room at the stadium. We need a few more seats too. Throw some more luxury seats in the new north endzone. It is quite embarrassing as a diehard fan to see that thing still standing. The school cares more about tearing down the irrelevant Maglev than re-doing the NEZ. Admin's heads are not thinking clearly and do not focus enough attention on the athletics.
|
|
| 05-04-2023 07:29 PM |
|
Stat Geek
Heisman

Posts: 8,877
Joined: Dec 2021
Reputation: 93
I Root For: Old Dominion
Location:
|
RE: ODU Master Plan
(05-04-2023 02:51 PM)Sithlord Wrote: So I just received some info about scholarship money provided by ODU and a comparable school FecesU (yuk). A good friend (local to the 757) said that their child received 6k in merit scholarship money from ODU and 11k in merit scholarship money from VCU. Estimated yearly costs with housing for ODU are about 21k and VCU is 24k. College acceptance day just passed so the child chose VCU.
I know out of pocket costs are close but why are we getting outbid on that front?
If their child was 6-10, they would have gotten more.
|
|
| 05-04-2023 08:14 PM |
|
Mr.BigBlue
Heisman

Posts: 5,781
Joined: May 2012
Reputation: 51
I Root For: Old Dominion
Location:
|
RE: ODU Master Plan
(05-04-2023 02:51 PM)Sithlord Wrote: So I just received some info about scholarship money provided by ODU and a comparable school FecesU (yuk). A good friend (local to the 757) said that their child received 6k in merit scholarship money from ODU and 11k in merit scholarship money from VCU. Estimated yearly costs with housing for ODU are about 21k and VCU is 24k. College acceptance day just passed so the child chose VCU.
I know out of pocket costs are close but why are we getting outbid on that front?
Good luck in Richmond finding off campus housing the is cheap after their freshman year.
|
|
| 05-04-2023 08:19 PM |
|
Monarchist13
Moderator

Posts: 20,404
Joined: May 2012
Reputation: 531
I Root For: ODU
Location: 757
|
RE: ODU Master Plan
(05-04-2023 07:29 PM)ODURallyFox Wrote: (03-20-2023 02:44 PM)monarx Wrote: (03-20-2023 01:37 PM)Blue_Trombone Wrote: (03-20-2023 12:02 PM)cbank Wrote: To everyone (including myself) that was hoping for a demolition of the NEZ anytime soon, it seems that the university will eb giving it life
(https://mvendor.cgieva.com/Vendor/public...id_round=3
I mean, while it does mean this won't happen next year, I would say that a project to increase the life of a structure to only 5-10 years more is pretty paltry. So I would say that if we wanted a prospective start date to construction it might be around 5-10 years from now
I’m glad they put in the 5-10 years part. I’d be pretty bummed if that eyesore is still there in 6-7 years. Maybe they are using all the Jones savings to save up for the NEZ and baseball stadium.
Our north endzone is a disgrace. We need a new locker room at the stadium. We need a few more seats too. Throw some more luxury seats in the new north endzone. It is quite embarrassing as a diehard fan to see that thing still standing. The school cares more about tearing down the irrelevant Maglev than re-doing the NEZ. Admin's heads are not thinking clearly and do not focus enough attention on the athletics.
Stadium lockerroom is way down the list of things the football staff says we need. They added more suites last year. They spent $74 million on the stadium and $3.5 mil at LR Hill for football all in the last few years. That debt is still being paid. They’re about to spend $20+ mil on the baseball stadium and spent millions on the volleyball facility. Your claims that they aren’t focusing enough on athletics just doesn’t hold water.
As for the maglev, part of it has to come down for the Biology building that is being constructed next year.
(This post was last modified: 05-04-2023 10:12 PM by Monarchist13.)
|
|
| 05-04-2023 10:11 PM |
|
monarx
Hall of Famer

Posts: 18,519
Joined: May 2012
Reputation: 419
I Root For: ODU
Location:
|
RE: ODU Master Plan
(05-04-2023 10:11 PM)Monarchist13 Wrote: (05-04-2023 07:29 PM)ODURallyFox Wrote: (03-20-2023 02:44 PM)monarx Wrote: (03-20-2023 01:37 PM)Blue_Trombone Wrote: (03-20-2023 12:02 PM)cbank Wrote: To everyone (including myself) that was hoping for a demolition of the NEZ anytime soon, it seems that the university will eb giving it life
(https://mvendor.cgieva.com/Vendor/public...id_round=3
I mean, while it does mean this won't happen next year, I would say that a project to increase the life of a structure to only 5-10 years more is pretty paltry. So I would say that if we wanted a prospective start date to construction it might be around 5-10 years from now
I’m glad they put in the 5-10 years part. I’d be pretty bummed if that eyesore is still there in 6-7 years. Maybe they are using all the Jones savings to save up for the NEZ and baseball stadium.
Our north endzone is a disgrace. We need a new locker room at the stadium. We need a few more seats too. Throw some more luxury seats in the new north endzone. It is quite embarrassing as a diehard fan to see that thing still standing. The school cares more about tearing down the irrelevant Maglev than re-doing the NEZ. Admin's heads are not thinking clearly and do not focus enough attention on the athletics.
Stadium lockerroom is way down the list of things the football staff says we need. They added more suites last year. They spent $74 million on the stadium and $3.5 mil at LR Hill for football all in the last few years. That debt is still being paid. They’re about to spend $20+ mil on the baseball stadium and spent millions on the volleyball facility. Your claims that they aren’t focusing enough on athletics just doesn’t hold water.
As for the maglev, part of it has to come down for the Biology building that is being constructed next year.
I would think the maglev stuff would come out of a different pool of money anyway. So doesn't affect athletics. ODU really got shafted with that too because the company that promised all the maglev awesomeness was supposed to tear down the track on their dime if it didnt work. Instead, they went bankrupt leaving us with the useless track. Its a shame it didnt work though. That would have brought global recognition to ODU. I don't blame ODU for moving ahead with the partnership even if in retrospect it was a bad idea. Thats the kind of risks good research universities should be taking.
|
|
| 05-05-2023 08:21 AM |
|
Blue_Trombone
Heisman

Posts: 8,666
Joined: Nov 2011
Reputation: 533
I Root For: Old Dominion
Location:
|
RE: ODU Master Plan
Also, tearing down a bit of maglev and building the entire NEZ would have two, uh, somewhat different costs.
|
|
| 05-05-2023 12:56 PM |
|
Monarchist13
Moderator

Posts: 20,404
Joined: May 2012
Reputation: 531
I Root For: ODU
Location: 757
|
RE: ODU Master Plan
(This post was last modified: 05-05-2023 05:08 PM by Monarchist13.)
|
|
| 05-05-2023 05:06 PM |
|
Sithlord
Special Teams

Posts: 542
Joined: May 2012
Reputation: 15
I Root For: ODU
Location:
|
RE: ODU Master Plan
(05-04-2023 08:19 PM)Mr.BigBlue Wrote: (05-04-2023 02:51 PM)Sithlord Wrote: So I just received some info about scholarship money provided by ODU and a comparable school FecesU (yuk). A good friend (local to the 757) said that their child received 6k in merit scholarship money from ODU and 11k in merit scholarship money from VCU. Estimated yearly costs with housing for ODU are about 21k and VCU is 24k. College acceptance day just passed so the child chose VCU.
I know out of pocket costs are close but why are we getting outbid on that front?
Good luck in Richmond finding off campus housing the is cheap after their freshman year.
Please explain in detail. I know nothing of what you speak. Are freshman required to stay on campus? How about after this?
|
|
| 05-05-2023 08:53 PM |
|
ODURallyFox
All American

Posts: 4,275
Joined: Dec 2022
Reputation: 45
I Root For: ODU
Location:
|
RE: ODU Master Plan
(05-05-2023 05:06 PM)Monarchist13 Wrote: Harry Minium just added his take on RallyFox’s ridiculous claim that “Admin's heads are not thinking clearly and do not focus enough attention on the athletics.”
Link: https://twitter.com/harry_miniumodu/stat...MkGWWpocwQ
Yet the football stadium is livint proof of this claim as it still lacks in certain areas. It took them a couple of years for cupholders to be installed. The upper level has no bathrooms, which is tacky. The elevators are nationally noted for all of the wrong reasons. And dont even get me started on the north end zone. The stadium quite frankly still needs work even though it is relatively new. We have a long ways to go to get it up to where it needs to be. It is still hodgepodged together between old and new. And it desperately needs to get out of that hodgepodge. Like it or not, thats the way it is and thats why I say what I say about it. The admin has not invested enough in it. Period.
|
|
| 05-06-2023 10:37 AM |
|
The Flagship
All American

Posts: 4,059
Joined: May 2012
Reputation: 84
I Root For: Old Dominion
Location:
|
RE: ODU Master Plan
(05-06-2023 10:37 AM)ODURallyFox Wrote: (05-05-2023 05:06 PM)Monarchist13 Wrote: Harry Minium just added his take on RallyFox’s ridiculous claim that “Admin's heads are not thinking clearly and do not focus enough attention on the athletics.”
Link: https://twitter.com/harry_miniumodu/stat...MkGWWpocwQ
Yet the football stadium is livint proof of this claim as it still lacks in certain areas. It took them a couple of years for cupholders to be installed. The upper level has no bathrooms, which is tacky. The elevators are nationally noted for all of the wrong reasons. And dont even get me started on the north end zone. The stadium quite frankly still needs work even though it is relatively new. We have a long ways to go to get it up to where it needs to be. It is still hodgepodged together between old and new. And it desperately needs to get out of that hodgepodge. Like it or not, thats the way it is and thats why I say what I say about it. The admin has not invested enough in it. Period.
Where is the money coming from to get everything up to your standards?
|
|
| 05-06-2023 11:47 AM |
|
ODU True Blue
All American

Posts: 3,692
Joined: Feb 2011
Reputation: 99
I Root For: Old Dominion
Location:
|
RE: ODU Master Plan
(05-06-2023 11:47 AM)The Flagship Wrote: (05-06-2023 10:37 AM)ODURallyFox Wrote: (05-05-2023 05:06 PM)Monarchist13 Wrote: Harry Minium just added his take on RallyFox’s ridiculous claim that “Admin's heads are not thinking clearly and do not focus enough attention on the athletics.”
Link: https://twitter.com/harry_miniumodu/stat...MkGWWpocwQ
Yet the football stadium is livint proof of this claim as it still lacks in certain areas. It took them a couple of years for cupholders to be installed. The upper level has no bathrooms, which is tacky. The elevators are nationally noted for all of the wrong reasons. And dont even get me started on the north end zone. The stadium quite frankly still needs work even though it is relatively new. We have a long ways to go to get it up to where it needs to be. It is still hodgepodged together between old and new. And it desperately needs to get out of that hodgepodge. Like it or not, thats the way it is and thats why I say what I say about it. The admin has not invested enough in it. Period.
Where is the money coming from to get everything up to your standards?
Not from his pockets that is fit damn sure.
|
|
| 05-06-2023 01:25 PM |
|