To Begin--where do we draw the line on capacity? It used to be 20,000 to most people. A few now say 15,000.
I'll go with ~about 17,000--but it must have a minimal G6 acceptable press box, some luxury suites and/or Club.
[Both Montanas, Tarleton, and SDSU for the most part are READY--facility-wise]
Expanding a stadium for Group of Six (G6) FBS play is rarely as simple as adding bleachers. Physical, geometric, and financial hurdles create absolute caps:
Northern Arizona (Walkup Skydome)
- Capacity: 11,230
- Bottleneck: Fixed-roof dome. The historic wood-span outer shell cannot be structurally expanded without a multi-million dollar total demolition. **Conclusion**>>Not Doable with current costs and controversy within admn. on athletic spending.
https://nauathletics.com/facilities/walkup-skydome/4
Cal Poly (Alex G. Spanos Stadium)
- Capacity: 11,075
- ANOTHER Bottleneck: Infrastructure trap. Tightly hemmed in by academic buildings and practice fields, causing possible vertical engineering costs to be expensive; would have to completely demolish and rebuild entire grandstands upward. **Conclusion** would add greatly by several tens of millions to other possible FBS transitions costs.
https://gopoly.com/facilities/mustang-me...hospital/3
Stony Brook (Kenneth P. LaValle Stadium)
- Capacity: 12,300
- Big drawback>>While end zones could physically fit expansion seats, it severely lacks the corporate luxury suites and massive press boxes needed for the FBS G6 level. **Conclusion** Attendance of only 4,792 (77th in FCS) make this expansion unthinkable.
llinois State (Hancock Stadium)
- Capacity: 13,391
- Tight space, campus grid constraints. Closely boxed in by university layout. The west side has structural and financial hurdles, and adding the kind of massive upper-deck seating required for a true G6 environment would require an entire structural overhaul of the foundation. They hope to build a FB facility in the South endzone. Nice looking stadium but once you start trying to improve challenges start to add up. 40-100 Million by my estimate. **Conclusion** They just don't have the money and will be fortunate to add the endzone FB facility.
https://goredbirds.com/facilities/hancock-stadium/55
EKU (Roy Kidd Stadium)-capacity in its current condition ~~11,000
- Messy situation; the current old side is partially unusable and repairs are too costly/not feasible-- a total demolition is needed. The new side is nice but only holds ~~about 3,600. Full replacement is in the 100 million dollar range or more. One problem is that most current information says the project is 3-5 yrs away. A Five year wait would increase the cost even more. An erector-set style could greatly reduce the cost. The state is not going to pay for the construction--although may provide a little money or back Bonds. Meanwhile attendance has fallen to 5,600 (62nd in FCS). Even lower so far this season and third behind FCS schools Murray and Morehead. **Conclusion**--a big hindrance for a school already not near the top of the list.