(07-19-2026 11:27 PM)DaBigBlue Wrote: It amazes me, we did SB Ballard in 9 months.
It was amazing, but the shortcuts and compromises are evident. It should have/could have been much better had we been able to take more time. And then it sat empty for a season (nobody's fault. just bad luck).
|
|
| 07-20-2026 09:46 AM |
|
The Flagship
All American

Posts: 4,059
Joined: May 2012
Reputation: 84
I Root For: Old Dominion
Location:
|
RE: 2026 ODU Baseball
At this point, it would be nice to have the locker room completed (operational) by mid-August when the players report for the Fall. And that's not all that imperative. The seats, press box, club area, and offices are not as important on the timeline. The most important thing is the cost. It will be interesting to see how much more this will cost than the original contract. We know there were initial delays due to existing underground utilities that were not expected to be where they were found. I'm sure that resolution was an increased cost and hopefully that fell within a planned contingency amount. I suspect that the recordkeeping/as-built drawings in 1982-3 were not as good as they should have been.
|
|
| 07-20-2026 11:20 AM |
|
Monarchblue
Hall of Famer

Posts: 11,624
Joined: May 2012
Reputation: 282
I Root For: ODU
Location:
|
RE: 2026 ODU Baseball
I have put in a couple of FOIA requests today. We'll see what I get back.
|
|
| 07-20-2026 11:32 AM |
|
ODUBall1986
2nd String

Posts: 277
Joined: Feb 2019
Reputation: 36
I Root For: Old Dominion
Location:
|
2026 ODU Baseball
(07-20-2026 11:32 AM)Monarchblue Wrote: I have put in a couple of FOIA requests today. We'll see what I get back.
And hopefully that will answer the question. For all we know, legitimate time extensions were granted and the contractor is still within his contract time.
What I do wonder about is why ODU isn’t more transparent. To be fair, ODU has to work within the procurement laws and it’s not like ODU is writing those laws.
Sent from my iPhone using Tapatalk
|
|
| 07-20-2026 11:37 AM |
|
Monarchblue
Hall of Famer

Posts: 11,624
Joined: May 2012
Reputation: 282
I Root For: ODU
Location:
|
RE: 2026 ODU Baseball
(07-20-2026 11:37 AM)ODUBall1986 Wrote: (07-20-2026 11:32 AM)Monarchblue Wrote: I have put in a couple of FOIA requests today. We'll see what I get back.
And hopefully that will answer the question. For all we know, legitimate time extensions were granted and the contractor is still within his contract time.
What I do wonder about is why ODU isn’t more transparent. To be fair, ODU has to work within the procurement laws and it’s not like ODU is writing those laws.
Sent from my iPhone using Tapatalk
I think the lack of transparency and the fact that everything seems to be a struggle for ODU are the reasons people are immediately skeptical what's going on. You are right, it could be totally legitimate, but based on what has been said on this board about the bidding process and the fact that the GC was unqualified for the job seem like they would have had something to do with the delays.
The question seems to be whether ODU could have done anything differently with the state and the bidding process that was seemingly forced on them to avoid an unqualified contractor getting the job. There was someone on this board that said this was going to be a **** show as soon as they found out who would be the GC, well before construction started. So, it definitely seems that there should be some questions pointed in that direction.
|
|
| 07-20-2026 11:48 AM |
|
monarx
Hall of Famer

Posts: 18,519
Joined: May 2012
Reputation: 419
I Root For: ODU
Location:
|
RE: 2026 ODU Baseball
(07-20-2026 11:48 AM)Monarchblue Wrote: (07-20-2026 11:37 AM)ODUBall1986 Wrote: (07-20-2026 11:32 AM)Monarchblue Wrote: I have put in a couple of FOIA requests today. We'll see what I get back.
And hopefully that will answer the question. For all we know, legitimate time extensions were granted and the contractor is still within his contract time.
What I do wonder about is why ODU isn’t more transparent. To be fair, ODU has to work within the procurement laws and it’s not like ODU is writing those laws.
Sent from my iPhone using Tapatalk
I think the lack of transparency and the fact that everything seems to be a struggle for ODU are the reasons people are immediately skeptical what's going on. You are right, it could be totally legitimate, but based on what has been said on this board about the bidding process and the fact that the GC was unqualified for the job seem like they would have had something to do with the delays.
The question seems to be whether ODU could have done anything differently with the state and the bidding process that was seemingly forced on them to avoid an unqualified contractor getting the job. There was someone on this board that said this was going to be a **** show as soon as they found out who would be the GC, well before construction started. So, it definitely seems that there should be some questions pointed in that direction.
Seems like a bad cycle. The ODU admin cant seem to get the State Government to trust them to make decisions, likely because they've made so many idiotic decisions in the past. So the idiots in the state government hamstring the ODU admin into making more poor decisions, and with fewer resources, making them look like bigger idiots than they really are. It's a cycle of stupid. Somehow we need legitimately good leadership, that can actually gain the confidence of the State, and prove they are actually good, trustworthy leaders.
|
|
| 07-20-2026 11:58 AM |
|
Monarchblue
Hall of Famer

Posts: 11,624
Joined: May 2012
Reputation: 282
I Root For: ODU
Location:
|
RE: 2026 ODU Baseball
(07-20-2026 11:58 AM)monarx Wrote: (07-20-2026 11:48 AM)Monarchblue Wrote: (07-20-2026 11:37 AM)ODUBall1986 Wrote: (07-20-2026 11:32 AM)Monarchblue Wrote: I have put in a couple of FOIA requests today. We'll see what I get back.
And hopefully that will answer the question. For all we know, legitimate time extensions were granted and the contractor is still within his contract time.
What I do wonder about is why ODU isn’t more transparent. To be fair, ODU has to work within the procurement laws and it’s not like ODU is writing those laws.
Sent from my iPhone using Tapatalk
I think the lack of transparency and the fact that everything seems to be a struggle for ODU are the reasons people are immediately skeptical what's going on. You are right, it could be totally legitimate, but based on what has been said on this board about the bidding process and the fact that the GC was unqualified for the job seem like they would have had something to do with the delays.
The question seems to be whether ODU could have done anything differently with the state and the bidding process that was seemingly forced on them to avoid an unqualified contractor getting the job. There was someone on this board that said this was going to be a **** show as soon as they found out who would be the GC, well before construction started. So, it definitely seems that there should be some questions pointed in that direction.
Seems like a bad cycle. The ODU admin cant seem to get the State Government to trust them to make decisions, likely because they've made so many idiotic decisions in the past. So the idiots in the state government hamstring the ODU admin into making more poor decisions, and with fewer resources, making them look like bigger idiots than they really are. It's a cycle of stupid. Somehow we need legitimately good leadership, that can actually gain the confidence of the State, and prove they are actually good, trustworthy leaders.
That's kind of the way I see it. I think the key is they need strong leadership that can get **** done in Richmond.
|
|
| 07-20-2026 12:56 PM |
|
ODUPKT07
Bench Warmer

Posts: 177
Joined: Oct 2013
Reputation: 4
I Root For: ODU
Location:
|
RE: 2026 ODU Baseball
Apologies if this is in the last Hundson Homer drop but I haven't had a chance to listen. In talking with one of the coaches a few weeks back, they were told they would be able to move into the locker room in August. He also mentioned come Oct 1, a $3K a day penalty kicks in for every day the stadium is not complete. That's roughly $450k if they don't finish until Feb. I was heading out around 8:30 that day and there were still guys there working.
|
|
| 07-20-2026 01:13 PM |
|
Can't Tame the Lion
Special Teams

Posts: 867
Joined: Jun 2012
Reputation: 51
I Root For: Old Dominion
Location:
|
RE: 2026 ODU Baseball
(07-20-2026 01:13 PM)ODUPKT07 Wrote: Apologies if this is in the last Hundson Homer drop but I haven't had a chance to listen. In talking with one of the coaches a few weeks back, they were told they would be able to move into the locker room in August. He also mentioned come Oct 1, a $3K a day penalty kicks in for every day the stadium is not complete. That's roughly $450k if they don't finish until Feb. I was heading out around 8:30 that day and there were still guys there working.
There have been some "unknowns" on this project just like every project, but it's how you handle those unknowns that make projects successful. The contractor could very well have received contract extensions via change order(s), but that doesn't mean ODU isn't paying more and getting a project delivered late. My point is, based on what I know, that the right project team could have vastly mitigated these issues. I believe I read above that there is a construction scheduler on this board and in this thread - that person will know what I'm generally referencing, because I'm sure they have had to deal with a similar scenario. BTW - yes, I do have some inside info. Also, the issues may not be clear in a FOIA.
|
|
| 07-20-2026 03:22 PM |
|
monarx
Hall of Famer

Posts: 18,519
Joined: May 2012
Reputation: 419
I Root For: ODU
Location:
|
RE: 2026 ODU Baseball
(07-20-2026 03:22 PM)Cant Tame the Lion Wrote: (07-20-2026 01:13 PM)ODUPKT07 Wrote: Apologies if this is in the last Hundson Homer drop but I haven't had a chance to listen. In talking with one of the coaches a few weeks back, they were told they would be able to move into the locker room in August. He also mentioned come Oct 1, a $3K a day penalty kicks in for every day the stadium is not complete. That's roughly $450k if they don't finish until Feb. I was heading out around 8:30 that day and there were still guys there working.
There have been some "unknowns" on this project just like every project, but it's how you handle those unknowns that make projects successful. The contractor could very well have received contract extensions via change order(s), but that doesn't mean ODU isn't paying more and getting a project delivered late. My point is, based on what I know, that the right project team could have vastly mitigated these issues. I believe I read above that there is a construction scheduler on this board and in this thread - that person will know what I'm generally referencing, because I'm sure they have had to deal with a similar scenario. BTW - yes, I do have some inside info. Also, the issues may not be clear in a FOIA.
So in your opinion, is this all on the state forcing us to use what some saw as an obviously under qualified firm, or do Wood and Hemphill bear some responsibility in this too?
|
|
| 07-20-2026 03:37 PM |
|
bluelotmayor
2nd String

Posts: 352
Joined: Sep 2013
Reputation: 18
I Root For: Old Dominion
Location: Chesapeake
|
RE: 2026 ODU Baseball
(07-20-2026 03:37 PM)monarx Wrote: (07-20-2026 03:22 PM)Cant Tame the Lion Wrote: (07-20-2026 01:13 PM)ODUPKT07 Wrote: Apologies if this is in the last Hundson Homer drop but I haven't had a chance to listen. In talking with one of the coaches a few weeks back, they were told they would be able to move into the locker room in August. He also mentioned come Oct 1, a $3K a day penalty kicks in for every day the stadium is not complete. That's roughly $450k if they don't finish until Feb. I was heading out around 8:30 that day and there were still guys there working.
There have been some "unknowns" on this project just like every project, but it's how you handle those unknowns that make projects successful. The contractor could very well have received contract extensions via change order(s), but that doesn't mean ODU isn't paying more and getting a project delivered late. My point is, based on what I know, that the right project team could have vastly mitigated these issues. I believe I read above that there is a construction scheduler on this board and in this thread - that person will know what I'm generally referencing, because I'm sure they have had to deal with a similar scenario. BTW - yes, I do have some inside info. Also, the issues may not be clear in a FOIA.
So in your opinion, is this all on the state forcing us to use what some saw as an obviously under qualified firm, or do Wood and Hemphill bear some responsibility in this too?
The state takes the lowest bid from qualified bidders rather than best value contracting. That means that the contract can go to a GC or their subcontractors that are not able to properly perform the work on a project. It appears that is the case with the GC on this project. I can say that is the case for at least one of the subcontractors who is behind and using unqualified and semi-skilled labor on the stadium.
|
|
| 07-20-2026 09:16 PM |
|
The Flagship
All American

Posts: 4,059
Joined: May 2012
Reputation: 84
I Root For: Old Dominion
Location:
|
RE: 2026 ODU Baseball
(07-20-2026 09:16 PM)bluelotmayor Wrote: (07-20-2026 03:37 PM)monarx Wrote: (07-20-2026 03:22 PM)Cant Tame the Lion Wrote: (07-20-2026 01:13 PM)ODUPKT07 Wrote: Apologies if this is in the last Hundson Homer drop but I haven't had a chance to listen. In talking with one of the coaches a few weeks back, they were told they would be able to move into the locker room in August. He also mentioned come Oct 1, a $3K a day penalty kicks in for every day the stadium is not complete. That's roughly $450k if they don't finish until Feb. I was heading out around 8:30 that day and there were still guys there working.
There have been some "unknowns" on this project just like every project, but it's how you handle those unknowns that make projects successful. The contractor could very well have received contract extensions via change order(s), but that doesn't mean ODU isn't paying more and getting a project delivered late. My point is, based on what I know, that the right project team could have vastly mitigated these issues. I believe I read above that there is a construction scheduler on this board and in this thread - that person will know what I'm generally referencing, because I'm sure they have had to deal with a similar scenario. BTW - yes, I do have some inside info. Also, the issues may not be clear in a FOIA.
So in your opinion, is this all on the state forcing us to use what some saw as an obviously under qualified firm, or do Wood and Hemphill bear some responsibility in this too?
The state takes the lowest bid from qualified bidders rather than best value contracting. That means that the contract can go to a GC or their subcontractors that are not able to properly perform the work on a project. It appears that is the case with the GC on this project. I can say that is the case for at least one of the subcontractors who is behind and using unqualified and semi-skilled labor on the stadium.
And as discussed before, that labor issue shouldn't be a surprise with the HRBT project draining the labor pool.
|
|
| 07-21-2026 04:13 AM |
|
Old Dominion
Heisman

Posts: 8,678
Joined: May 2012
Reputation: 163
I Root For: Old Dominion
Location: Almost six feet deep
|
RE: 2026 ODU Baseball
My skeptical self says let's see who the GC donates political money to.
|
|
| 07-21-2026 06:22 AM |
|
Can't Tame the Lion
Special Teams

Posts: 867
Joined: Jun 2012
Reputation: 51
I Root For: Old Dominion
Location:
|
RE: 2026 ODU Baseball
(07-20-2026 03:37 PM)monarx Wrote: (07-20-2026 03:22 PM)Cant Tame the Lion Wrote: (07-20-2026 01:13 PM)ODUPKT07 Wrote: Apologies if this is in the last Hundson Homer drop but I haven't had a chance to listen. In talking with one of the coaches a few weeks back, they were told they would be able to move into the locker room in August. He also mentioned come Oct 1, a $3K a day penalty kicks in for every day the stadium is not complete. That's roughly $450k if they don't finish until Feb. I was heading out around 8:30 that day and there were still guys there working.
There have been some "unknowns" on this project just like every project, but it's how you handle those unknowns that make projects successful. The contractor could very well have received contract extensions via change order(s), but that doesn't mean ODU isn't paying more and getting a project delivered late. My point is, based on what I know, that the right project team could have vastly mitigated these issues. I believe I read above that there is a construction scheduler on this board and in this thread - that person will know what I'm generally referencing, because I'm sure they have had to deal with a similar scenario. BTW - yes, I do have some inside info. Also, the issues may not be clear in a FOIA.
So in your opinion, is this all on the state forcing us to use what some saw as an obviously under qualified firm, or do Wood and Hemphill bear some responsibility in this too?
I would say it's both and the buck stops with Hemphill on the ODU side.
|
|
| 07-21-2026 06:49 AM |
|
Can't Tame the Lion
Special Teams

Posts: 867
Joined: Jun 2012
Reputation: 51
I Root For: Old Dominion
Location:
|
RE: 2026 ODU Baseball
(07-21-2026 06:22 AM)Old Dominion Wrote: My skeptical self says let's see who the GC donates political money to.
That's not really a factor in this type of procurement.
|
|
| 07-21-2026 06:50 AM |
|
Old Dominion
Heisman

Posts: 8,678
Joined: May 2012
Reputation: 163
I Root For: Old Dominion
Location: Almost six feet deep
|
RE: 2026 ODU Baseball
(07-21-2026 06:50 AM)Cant Tame the Lion Wrote: (07-21-2026 06:22 AM)Old Dominion Wrote: My skeptical self says let's see who the GC donates political money to.
That's not really a factor in this type of procurement.
Are you saying the Governor is not in a position to influence this type thing?
|
|
| 07-21-2026 12:58 PM |
|
MonGNARch
All American

Posts: 3,161
Joined: Jan 2015
Reputation: 87
I Root For: The Ol' Dirty
Location: DC
|
RE: 2026 ODU Baseball
(07-21-2026 06:49 AM)Cant Tame the Lion Wrote: (07-20-2026 03:37 PM)monarx Wrote: (07-20-2026 03:22 PM)Cant Tame the Lion Wrote: (07-20-2026 01:13 PM)ODUPKT07 Wrote: Apologies if this is in the last Hundson Homer drop but I haven't had a chance to listen. In talking with one of the coaches a few weeks back, they were told they would be able to move into the locker room in August. He also mentioned come Oct 1, a $3K a day penalty kicks in for every day the stadium is not complete. That's roughly $450k if they don't finish until Feb. I was heading out around 8:30 that day and there were still guys there working.
There have been some "unknowns" on this project just like every project, but it's how you handle those unknowns that make projects successful. The contractor could very well have received contract extensions via change order(s), but that doesn't mean ODU isn't paying more and getting a project delivered late. My point is, based on what I know, that the right project team could have vastly mitigated these issues. I believe I read above that there is a construction scheduler on this board and in this thread - that person will know what I'm generally referencing, because I'm sure they have had to deal with a similar scenario. BTW - yes, I do have some inside info. Also, the issues may not be clear in a FOIA.
So in your opinion, is this all on the state forcing us to use what some saw as an obviously under qualified firm, or do Wood and Hemphill bear some responsibility in this too?
I would say it's both and the buck stops with Hemphill on the ODU side.
ODU is the "owner/client" in this scenario. The GC not being able to deliver on time wouldn't necessarily fall on us. A GC worth their salt would be able to mitigate delays and use various workarounds. If we changed design halfway through construction (which I highly doubt happened) then we would have to stomach the potential of the project being pushed out. While we are used to incompetence from Wood and Hemphill, I don't think construction delays are their fault. Look at what SB Ballard was able to do in one offseason with the football stadium a few years back
|
|
| 07-21-2026 01:15 PM |
|
bluelotmayor
2nd String

Posts: 352
Joined: Sep 2013
Reputation: 18
I Root For: Old Dominion
Location: Chesapeake
|
RE: 2026 ODU Baseball
(07-21-2026 04:13 AM)The Flagship Wrote: (07-20-2026 09:16 PM)bluelotmayor Wrote: (07-20-2026 03:37 PM)monarx Wrote: (07-20-2026 03:22 PM)Cant Tame the Lion Wrote: (07-20-2026 01:13 PM)ODUPKT07 Wrote: Apologies if this is in the last Hundson Homer drop but I haven't had a chance to listen. In talking with one of the coaches a few weeks back, they were told they would be able to move into the locker room in August. He also mentioned come Oct 1, a $3K a day penalty kicks in for every day the stadium is not complete. That's roughly $450k if they don't finish until Feb. I was heading out around 8:30 that day and there were still guys there working.
There have been some "unknowns" on this project just like every project, but it's how you handle those unknowns that make projects successful. The contractor could very well have received contract extensions via change order(s), but that doesn't mean ODU isn't paying more and getting a project delivered late. My point is, based on what I know, that the right project team could have vastly mitigated these issues. I believe I read above that there is a construction scheduler on this board and in this thread - that person will know what I'm generally referencing, because I'm sure they have had to deal with a similar scenario. BTW - yes, I do have some inside info. Also, the issues may not be clear in a FOIA.
So in your opinion, is this all on the state forcing us to use what some saw as an obviously under qualified firm, or do Wood and Hemphill bear some responsibility in this too?
The state takes the lowest bid from qualified bidders rather than best value contracting. That means that the contract can go to a GC or their subcontractors that are not able to properly perform the work on a project. It appears that is the case with the GC on this project. I can say that is the case for at least one of the subcontractors who is behind and using unqualified and semi-skilled labor on the stadium.
And as discussed before, that labor issue shouldn't be a surprise with the HRBT project draining the labor pool.
Not just the HRBT. There is so much construction going on in Hampton Roads right now that qualified labor is a premium. And many employers don't believe in paying a premium, instead opting for semi-skilled workers and winging it. The customer, in this case ODU, are left with a less than top quality product that is behind schedule
|
|
| 07-21-2026 08:42 PM |
|
Monarchblue
Hall of Famer

Posts: 11,624
Joined: May 2012
Reputation: 282
I Root For: ODU
Location:
|
RE: 2026 ODU Baseball
From my understanding, where this went wrong in the bidding process is that there are two potential bid processes. One where pretty much anyone can bid and the lowest bidder wins, and another where ODU is able to pull together a list of qualified candidates who are able to bid. The state forced ODU to go with the first option and that opened the door to an unqualified GC making the low bid. This is something I remember hearing on this board at the very outset of the project, so take it for what its worth. My memory could absolutely be recounting that wrong.
|
|
| 07-22-2026 09:17 AM |
|
Can't Tame the Lion
Special Teams

Posts: 867
Joined: Jun 2012
Reputation: 51
I Root For: Old Dominion
Location:
|
RE: 2026 ODU Baseball
(07-22-2026 09:17 AM)Monarchblue Wrote: From my understanding, where this went wrong in the bidding process is that there are two potential bid processes. One where pretty much anyone can bid and the lowest bidder wins, and another where ODU is able to pull together a list of qualified candidates who are able to bid. The state forced ODU to go with the first option and that opened the door to an unqualified GC making the low bid. This is something I remember hearing on this board at the very outset of the project, so take it for what its worth. My memory could absolutely be recounting that wrong.
This is absolutely correct. Not seeing this as an issue or not being able to correct it is what concerns me about our leadership (Hemphill) and status ODU has in Richmond.
|
|