(02-25-2022 12:20 PM)Gemofthehills Wrote: (02-25-2022 11:17 AM)DubG Wrote: (07-21-2021 09:03 PM)Gemofthehills Wrote: These are renderings not the final plans. Sure some changes will be made.
Do you think they will continue with this design with the move to FCS? Looks good but seems odd to block in any potential to expand seating on that one side.
Several of us agree but it does seem to be moving forward. Going the more premium than volume plan.
Yep. There will be changes made, but it appears at this time those will be more cosmetic than any kind of wholesale changes to open up the possibility of future expansion along the sidelines.
(There is room remaining for limited expansion in the east end zone, if it's ever needed.)
As Gem said, JSU is going with the strategy of "create demand" rather than "increase supply". If the stadium starts selling out regularly, ticket prices can be raised, creating more revenue. At the same time, a sold out 20K stadium has a far better gameday atmosphere than a 1/2 to 3/4 filled 30K stadium. This positively impacts both recruiting and media presence. (No one wants to televise empty seats.)
If the time ever comes when JSU needs a 50K+ seat stadium, I'm guessing we'll have the budget then to pay for the massive demolition the upgrade will require.
I honestly don't believe we'll need anything that size for quite some time. Most of the G5 stadiums in that range or bigger are located in cities (such as Birmingham, El Paso, and Ruston) which have hosted bowl games or other large events. That obviously isn't a factor for Jacksonville State.