Bronco'14
WMU
Posts: 12,389
Joined: Aug 2012
Reputation: 201
I Root For: WMU Broncos
Location: Grand Rapids, MI
|
RE: Campus construction projects continue
I hope they leave green space at where at least one of these dorms was. There's no way any on-campus housing building is near-full.
|
|
06-23-2021 12:38 PM |
|
BaldingBroncoFan
1st String
Posts: 1,137
Joined: Apr 2007
Reputation: 10
I Root For:
Location:
|
RE: Campus construction projects continue
The architectural artwork shows a lot of green space through that area. I think they are putting in a hotel / conference center on that spot.
https://wmich.edu/capitalprojects/hilltopvillage
It's basically a new campus from my days in the mid 80's
|
|
06-23-2021 01:24 PM |
|
SilentStryk09
Heisman
Posts: 5,803
Joined: Dec 2011
Reputation: 36
I Root For: WMU
Location: Waterford, MI
|
RE: Campus construction projects continue
The green space is being left, i believe it was a huge focus of this project to have more of a "traditional" campus feel and not the concrete jungle it was previously.
|
|
06-23-2021 01:35 PM |
|
Bronco'14
WMU
Posts: 12,389
Joined: Aug 2012
Reputation: 201
I Root For: WMU Broncos
Location: Grand Rapids, MI
|
RE: Campus construction projects continue
That top rendering looks great. Looks like there'll be a good-sized 'field'. I"ll miss the parking lot that used to be there, tho.
I don't see parking lots in general.....
(This post was last modified: 06-23-2021 03:11 PM by Bronco'14.)
|
|
06-23-2021 03:09 PM |
|
Bronco68
Bench Warmer
Posts: 124
Joined: Nov 2008
Reputation: 2
I Root For: wmu
Location:
|
RE: Campus construction projects continue
I think I saw a parking ramp next to the field house and rec center on one of plans and near the proposed hotel
|
|
06-23-2021 05:50 PM |
|
BaldingBroncoFan
1st String
Posts: 1,137
Joined: Apr 2007
Reputation: 10
I Root For:
Location:
|
RE: Campus construction projects continue
Now French Hall is coming down.
|
|
08-09-2021 02:38 PM |
|
Cocksman
1st String
Posts: 1,452
Joined: Aug 2018
Reputation: 14
I Root For: WMU
Location:
|
RE: Campus construction projects continue
|
|
08-13-2021 06:35 PM |
|
BaldingBroncoFan
1st String
Posts: 1,137
Joined: Apr 2007
Reputation: 10
I Root For:
Location:
|
RE: Campus construction projects continue
|
|
08-14-2021 09:44 AM |
|
bronco74
Special Teams
Posts: 696
Joined: Apr 2007
Reputation: 3
I Root For:
Location:
|
RE: Campus construction projects continue
(08-14-2021 09:44 AM)BaldingBroncoFan Wrote: (08-13-2021 06:35 PM)Cocksman Wrote: Bells on campus would be awesome
https://www.mlive.com/news/kalamazoo/202...rsity.html
Interesting idea. It seems like the new hotel or the mixed use area across the street would be a better location.
Do they sell beer/wine at Miller during performances? Or is not allowed by Michigan?
|
|
08-14-2021 11:34 AM |
|
BaldingBroncoFan
1st String
Posts: 1,137
Joined: Apr 2007
Reputation: 10
I Root For:
Location:
|
RE: Campus construction projects continue
Hadn't been paying attention to the campus projects.
The Burnham's were taken down at some point this spring.
|
|
05-11-2023 02:57 PM |
|
BroncoMD
1st String
Posts: 1,414
Joined: May 2002
Reputation: 7
I Root For: WMU
Location:
|
RE: Campus construction projects continue
Personally, I would like to see more consistency with buildings around campus. I realize that buildings are put up in different decades, but at some point leadership needs to take the reins and start a standard. Do you prefer a modern design over brick and mortar? No problem -- set the standard going forward.
It's similar to our branding problem. Keep the brown and metallic gold going forward but produce a retro line of brown and yellow for those that want it.
|
|
05-14-2023 09:42 PM |
|
Cocksman
1st String
Posts: 1,452
Joined: Aug 2018
Reputation: 14
I Root For: WMU
Location:
|
RE: Campus construction projects continue
(05-14-2023 09:42 PM)BroncoMD Wrote: Personally, I would like to see more consistency with buildings around campus. I realize that buildings are put up in different decades, but at some point leadership needs to take the reins and start a standard. Do you prefer a modern design over brick and mortar? No problem -- set the standard going forward.
It's similar to our branding problem. Keep the brown and metallic gold going forward but produce a retro line of brown and yellow for those that want it.
Completely agree. Style would look better if consistent across campus.
|
|
05-18-2023 12:19 PM |
|
ColinApocalypse
Moderator
Posts: 9,975
Joined: Jul 2012
Reputation: 111
I Root For: WMU
Location: Kalamazoo, MI
|
RE: Campus construction projects continue
(05-18-2023 12:19 PM)Cocksman Wrote: (05-14-2023 09:42 PM)BroncoMD Wrote: Personally, I would like to see more consistency with buildings around campus. I realize that buildings are put up in different decades, but at some point leadership needs to take the reins and start a standard. Do you prefer a modern design over brick and mortar? No problem -- set the standard going forward.
It's similar to our branding problem. Keep the brown and metallic gold going forward but produce a retro line of brown and yellow for those that want it.
Completely agree. Style would look better if consistent across campus.
I agree, I've been saying it for years. We need to pick one architectural style. All the best campuses in the world have a cohesive design element, but ours feels like a hodgepodge of differing styles. EVERY new building is different from the last.
If we go classic red brick collegiate, stick with it. If we go brutalist, stick with it. If we go ultramodern steel and glass, stick with it. Don't reinvent the wheel every time a building needs to be replaced.
|
|
05-18-2023 02:38 PM |
|