CINCINNATI – Proposed additions to the University of Cincinnati’s Nippert Stadium are a step closer to reality following the release of new renderings and floor plans for the Nippert Stadium Renovation & Expansion, director of athletics Whit Babcock announced Thursday.
Construction on the $86-millon, privately funded project, is scheduled to begin in mid-December 2013 and be completed in August of 2015.
“As we promised back in June we wanted to share with the Bearcat Family the exciting progress being made in the stadium design,” Babcock said. “As these renderings demonstrate, Nippert Stadium will add another signature facility in the heart of our beautiful campus. There will be some more tweaks and changes regarding design in the coming months. These renderings are close to final but still conceptual at this point.”
The expanded renovation focuses on both the east and west side of the stadium and will increase the stadium’s capacity to approximately 40,000. On the west side, a new press box structure will be built, adding suites, scholarship club seats and loge boxes/patio suites. The west concourse will also be renovated, including concession stands and restrooms. Changes on the east side include expanded concessions and restroom offerings, including the building of skywalks to connect the upper deck with the gameday plaza on O’Varsity Way.
The new west-side structure would be approximately one and one-half stories taller than the current press box and approximately 130 yards long. The curvature of the facility would match that of the upper deck on the east side of the stadium and contain four levels; a press and operations level, suite level, scholarship club level, and patio suites mezzanine level.
http://www.gobearcats.com/sports/m-footb...13aac.html
link to slideshow
http://grfx.cstv.com/photos/schools/cinn...ansion.pdf