Hello There, Guest! Registered users see far less ads! Register today and join our virtual tailgate. (Login — Register)

Post Reply 
Marines 3D-print concrete barracks in just 40 hours
Author Message
CrimsonPhantom Offline
CUSA Curator
*

Posts: 62,723
Joined: Mar 2013
Reputation: 3188
I Root For: NM State
Location:
Post: #1
Marines 3D-print concrete barracks in just 40 hours
[Image: 1535557760175.jpg?ve=1&tl=1]

Quote:Marines have used a specialized 3D concrete printer to print a 500-square-foot barracks room in just 40 hours.

The innovative project created the world’s first continuous 3D-printed concrete barracks, according to the Marine Corps.

The barracks room was built earlier this month at the U.S. Army Engineer Research and Development Center in Champaign, Ill. Army and Navy Seabees were also involved in the construction effort.

Harnessing the world’s largest concrete printer, the Additive Manufacturing Team at Marine Corps Systems Command teamed up with Marines from I Marine Expeditionary Force.

“This exercise had never been done before,” said Capt. Matthew Friedell, Additive Manufacturing project officer in MCSC’s Operations and Programs/G-3, in a statement. “People have printed buildings and large structures, but they haven’t done it onsite and all at once. This is the first-in-the-world, onsite continuous concrete print.”

Using Computer Aided Design software on a 10-year-old computer, the concrete was pushed through a print head and layered repeatedly to build the barracks room walls. Friedell said that the job took 40 hours because Marines were carefully monitoring the project and continually filling the printer with concrete. However, if a robot was used to do the mixing and pumping, the building could be built in 24 hours, he added.

Normally, it takes 10 Marines five days to construct a barracks hut out of wood.

Set against this backdrop, the construction technology could help keep U.S. military personnel safe.

“In active or simulated combat environments, we don’t want Marines out there swinging hammers and holding plywood up,” said Friedell. “Having a concrete printer that can make buildings on demand is a huge advantage for Marines operating down range.”

More testing will now be done on the Marines’ new barracks-building technology.

Link

Very cool!

At the end of the article it says the private sector is looking into using 3d printings for building. What are illegals ‘working’ in construction gonna do?
08-29-2018 05:38 PM
Visit this user's website Find all posts by this user Quote this message in a reply
Advertisement


Post Reply 


Messages In This Thread
Marines 3D-print concrete barracks in just 40 hours - CrimsonPhantom - 08-29-2018 05:38 PM



User(s) browsing this thread:


Copyright © 2002-2026 Collegiate Sports Nation Bulletin Board System (CSNbbs), All Rights Reserved.
CSNbbs is an independent fan site and is in no way affiliated to the NCAA or any of the schools and conferences it represents.
This site monetizes links. FTC Disclosure.
We allow third-party companies to serve ads and/or collect certain anonymous information when you visit our web site. These companies may use non-personally identifiable information (e.g., click stream information, browser type, time and date, subject of advertisements clicked or scrolled over) during your visits to this and other Web sites in order to provide advertisements about goods and services likely to be of greater interest to you. These companies typically use a cookie or third party web beacon to collect this information. To learn more about this behavioral advertising practice or to opt-out of this type of advertising, you can visit http://www.networkadvertising.org.
Powered By MyBB, © 2002-2026 MyBB Group.