RE: NEW stadium construction - ODU2011 - 05-17-2019 04:24 PM

Will look incredible when the nez is finished with the scoreboard over it. 03-cloud9


RE: NEW stadium construction - VB Monarch - 05-17-2019 04:54 PM

Anyone know the dimensions of the existing board? Looks like they will be able to use the existing frame to hold the new one.


RE: NEW stadium construction - FearTheLion - 05-17-2019 05:37 PM

(05-17-2019 03:05 PM)The Flagship Wrote:  
(05-17-2019 01:14 PM)ODUDrunkard13 Wrote:  They updated the scoreboard design;


The word "UNIVERSITY" needs to be eliminated and the "OLD DOMINION" needs to be bigger. (see Virginia Tech scoreboard) Big and bold is the only way to go.

There is no need for "UNIVERSITY". We don't have it along the baseline of the basketball court, so the precedent is set.

Agreed.


RE: NEW stadium construction - ODU2K1 - 05-17-2019 07:23 PM

(05-17-2019 03:05 PM)The Flagship Wrote:  
(05-17-2019 01:14 PM)ODUDrunkard13 Wrote:  They updated the scoreboard design;


The word "UNIVERSITY" needs to be eliminated and the "OLD DOMINION" needs to be bigger. (see Virginia Tech scoreboard) Big and bold is the only way to go.

There is no need for "UNIVERSITY". We don't have it along the baseline of the basketball court, so the precedent is set.

This.


RE: NEW stadium construction - GhentFan - 05-17-2019 07:35 PM

(05-17-2019 03:05 PM)The Flagship Wrote:  
(05-17-2019 01:14 PM)ODUDrunkard13 Wrote:  They updated the scoreboard design;


The word "UNIVERSITY" needs to be eliminated and the "OLD DOMINION" needs to be bigger. (see Virginia Tech scoreboard) Big and bold is the only way to go.

There is no need for "UNIVERSITY". We don't have it along the baseline of the basketball court, so the precedent is set.

Change out the crown logo to the lion head shield. I hate the crown and odu logo.. the font is so ugly :(


RE: NEW stadium construction - CameramanJ - 05-17-2019 07:49 PM

I don't feel like zooming in, how is the kerning


RE: NEW stadium construction - ODU2K1 - 05-17-2019 08:02 PM

(05-17-2019 07:35 PM)GhentFan Wrote:  
(05-17-2019 03:05 PM)The Flagship Wrote:  
(05-17-2019 01:14 PM)ODUDrunkard13 Wrote:  They updated the scoreboard design;


The word "UNIVERSITY" needs to be eliminated and the "OLD DOMINION" needs to be bigger. (see Virginia Tech scoreboard) Big and bold is the only way to go.

There is no need for "UNIVERSITY". We don't have it along the baseline of the basketball court, so the precedent is set.

Change out the crown logo to the lion head shield. I hate the crown and odu logo.. the font is so ugly :(

Also this. While the font doesn’t bother me the chef hat is terrible.


RE: NEW stadium construction - Sirloin Burger - 05-18-2019 12:04 AM

They could've been clever and made the dimensions 49' by 35' ......


RE: NEW stadium construction - GhentFan - 05-18-2019 05:28 AM

They should have stuck with this version. Still not ideal, but better then what is now the design. :(


RE: NEW stadium construction - Retroview1955 - 05-18-2019 09:22 PM

Apparently, there was an event yesterday by ODU officials and some season ticket holders were invited. Someone told me this eariler today when I was on top of the 49 street garage watching construction. They said "Phase two is this project will build more luxury suite over top of the new pressbox, a new place north end zone and a third row on the Eastside stands. The price will be about the same as Phase one."


RE: NEW stadium construction - bigblueodu - 05-19-2019 12:15 AM

What? Carve out more luxury suites in existing press box areas, or build on top... how could they build on top?
"A new place north endzone"?
What does that even mean?
And wr have to raise another 65mill?

Sent from my SM-G965U using CSNbbs mobile app


RE: NEW stadium construction - Sirloin Burger - 05-19-2019 01:52 AM

I'll give it a shot,

In phase 2, luxury suites will be built on top of the press box. The NEZ will be renovated and the east stands will be expanded.

This should bring the seating capacity close to or at 30,000 seats.


RE: NEW stadium construction - bit_9 - 05-19-2019 07:39 AM

(05-18-2019 09:22 PM)Retroview1955 Wrote:  Apparently, there was an event yesterday by ODU officials and some season ticket holders were invited. Someone told me this eariler today when I was on top of the 49 street garage watching construction. They said "Phase two is this project will build more luxury suite over top of the new pressbox, a new place north end zone and a third row on the Eastside stands. The price will be about the same as Phase one."

So new suites over press boxes.
"A new place" looks like autocorrect for replace nez.
And third level on east side.

Total const cost about the same as the phase 1 renovation.

Interesting. Wonder of that holds any water. If so that means that nez will be as is for quite a while. Which will irritate many as it'll feel unfinished. Buuuut if they come out and have a clearly defined vision and goal to pull all 3 of those off and say "We want this. You want this. Deal with the nez for a few extra years and we will do all of this by 202x." I think that's totally doable.


RE: NEW stadium construction - monarx - 05-19-2019 01:25 PM

That could all be done in 3 separate phases too. My guess would be NEZ first, then the suites. At that point I hope demand makes it imperative to build the upper deck.


RE: NEW stadium construction - benny_t - 05-19-2019 01:27 PM

(05-19-2019 01:25 PM)monarx Wrote:  That could all be done in 3 separate phases too. My guess would be NEZ first, then the suites. At that point I hope demand makes it imperative to build the upper deck.
More suites would probably be first. They will generate more revenue than the NEZ.

Sent from my SM-N950U using Tapatalk


RE: NEW stadium construction - monarx - 05-19-2019 01:30 PM

(05-17-2019 08:02 PM)ODU2K1 Wrote:  
(05-17-2019 07:35 PM)GhentFan Wrote:  
(05-17-2019 03:05 PM)The Flagship Wrote:  
(05-17-2019 01:14 PM)ODUDrunkard13 Wrote:  They updated the scoreboard design;


The word "UNIVERSITY" needs to be eliminated and the "OLD DOMINION" needs to be bigger. (see Virginia Tech scoreboard) Big and bold is the only way to go.

There is no need for "UNIVERSITY". We don't have it along the baseline of the basketball court, so the precedent is set.

Change out the crown logo to the lion head shield. I hate the crown and odu logo.. the font is so ugly :(

Also this. While the font doesn’t bother me the chef hat is terrible.

Agreed. Plus, it’s redundant. The only time we shouldn’t use the shield is when it’s not clear it’s ODU. In this case it has the whole name right under it. Use the shield and put the big blue lion graphics back on the stadium too please.


RE: NEW stadium construction - monarx - 05-19-2019 01:31 PM

(05-17-2019 08:02 PM)ODU2K1 Wrote:  
(05-17-2019 07:35 PM)GhentFan Wrote:  
(05-17-2019 03:05 PM)The Flagship Wrote:  
(05-17-2019 01:14 PM)ODUDrunkard13 Wrote:  They updated the scoreboard design;


The word "UNIVERSITY" needs to be eliminated and the "OLD DOMINION" needs to be bigger. (see Virginia Tech scoreboard) Big and bold is the only way to go.

There is no need for "UNIVERSITY". We don't have it along the baseline of the basketball court, so the precedent is set.

Change out the crown logo to the lion head shield. I hate the crown and odu logo.. the font is so ugly :(

Also this. While the font doesn’t bother me the chef hat is terrible.

True. The only thing worse than the chef hat crown is the newer academic “crown”.


RE: NEW stadium construction - GhentFan - 05-19-2019 03:06 PM

Went back t


Current Phase 1

[Image: 2115vmb.png]





Proposed Phase 1 from the study

[Image: 2i92o21.png]



Proposed Final design from the study

[Image: vnm51e.png]

SB Ballard's unsolicited proposal
[Image: 14kzmr.png]
[Image: a0v24n.png]


RE: NEW stadium construction - Mr.BigBlue - 05-19-2019 05:04 PM

NEZ and possibly suites will be next. It will be several years (3-4 minimum) before that even makes it back on the radar.


RE: NEW stadium construction - Sirloin Burger - 05-19-2019 07:40 PM

Warning click at your own risk. NEZ replacement proponents may find this traumatizing,

Link