An update on plans for the next 5 years. R-1 research funds, new buildings, expanded research support, state funding, etc. Hardgrave has hit the ground running.


‘The research modernization is just one component of this. U of M is also looking to gain more research funding, and as chief government relations and policy officer Katie VanLandingham noted during the meeting, Governor Bill Lee has proposed that the state give U of M $50 million for a research endowment to maintain R1 status — which U of M would then match dollar-for-dollar, making it a $100 million fund.

And U of M has other capital projects in the works that could support U of M’s R1 efforts, too. During the meeting, chief university planning officer Tony Poteet laid out the school’s five-year capital outlay plan, which, besides the research modernization, includes these facilities:

A $68.41 million interdisciplinary science facility on the main campus, expected to be funded in the 2024-25 year
A $54 million research park — new research facilities west of the main campus — expected to be funded in the 2025-26 year
An $83 million building replacement for Mitchell Hall and Clement Hall, expected to be funded in the 2026-27 year
A $28 million research renovation and physical plant relocation — the school will relocate its plant and use the current facility for research — expected to be funded in 2027-28 year

U of M has also already received funding from the State for two other projects. It’s scored $25 million in state funding for the renovation of the Fogelman College of Business and Economics, which will be paired with $5 million in matching funds from U of M — putting the cost at $30 million.

And it’s received $20 million in state funding for the renovation of Mynders Hall — U of M’s first residence hall, built in 1912 — which, like the Fogelman project, will be paired with $5 million in matching funds from the university. This puts the renovation’s cost at $25 million.”
06-04-2022 04:37 AM
Find all posts by this user Quote this message in a reply
Advertisement


DDrum1961 Offline
1st String
*

Posts: 1,165
Joined: Jan 2007
Reputation: 64
I Root For: Memphis
Location: Bartlett
Post: #2
RE: Campus space, facilities and funding
(06-04-2022 04:37 AM)Tigerx3 Wrote:  An update on plans for the next 5 years. R-1 research funds, new buildings, expanded research support, state funding, etc. Hardgrave has hit the ground running.


‘The research modernization is just one component of this. U of M is also looking to gain more research funding, and as chief government relations and policy officer Katie VanLandingham noted during the meeting, Governor Bill Lee has proposed that the state give U of M $50 million for a research endowment to maintain R1 status — which U of M would then match dollar-for-dollar, making it a $100 million fund.

And U of M has other capital projects in the works that could support U of M’s R1 efforts, too. During the meeting, chief university planning officer Tony Poteet laid out the school’s five-year capital outlay plan, which, besides the research modernization, includes these facilities:

A $68.41 million interdisciplinary science facility on the main campus, expected to be funded in the 2024-25 year
A $54 million research park — new research facilities west of the main campus — expected to be funded in the 2025-26 year
An $83 million building replacement for Mitchell Hall and Clement Hall, expected to be funded in the 2026-27 year
A $28 million research renovation and physical plant relocation — the school will relocate its plant and use the current facility for research — expected to be funded in 2027-28 year

U of M has also already received funding from the State for two other projects. It’s scored $25 million in state funding for the renovation of the Fogelman College of Business and Economics, which will be paired with $5 million in matching funds from U of M — putting the cost at $30 million.

And it’s received $20 million in state funding for the renovation of Mynders Hall — U of M’s first residence hall, built in 1912 — which, like the Fogelman project, will be paired with $5 million in matching funds from the university. This puts the renovation’s cost at $25 million.”

Is there a link to a "new" Masterplan that reflects some of this ? The one I have saved is so old, it shows the Scheidt Music building being built off of Highland, and I've seen it being constructed on Central replacing some of the parking lot there ..
06-04-2022 10:17 AM
Find all posts by this user Quote this message in a reply
Tigerx3 Offline
Hall of Famer
*

Posts: 12,385
Joined: Mar 2004
Reputation: 959
I Root For: Memphis
Location: Germantown
Post: #3
RE: Campus space, facilities and funding
(06-04-2022 10:17 AM)DDrum1961 Wrote:  
(06-04-2022 04:37 AM)Tigerx3 Wrote:  An update on plans for the next 5 years. R-1 research funds, new buildings, expanded research support, state funding, etc. Hardgrave has hit the ground running.


‘The research modernization is just one component of this. U of M is also looking to gain more research funding, and as chief government relations and policy officer Katie VanLandingham noted during the meeting, Governor Bill Lee has proposed that the state give U of M $50 million for a research endowment to maintain R1 status — which U of M would then match dollar-for-dollar, making it a $100 million fund.

And U of M has other capital projects in the works that could support U of M’s R1 efforts, too. During the meeting, chief university planning officer Tony Poteet laid out the school’s five-year capital outlay plan, which, besides the research modernization, includes these facilities:

A $68.41 million interdisciplinary science facility on the main campus, expected to be funded in the 2024-25 year
A $54 million research park — new research facilities west of the main campus — expected to be funded in the 2025-26 year
An $83 million building replacement for Mitchell Hall and Clement Hall, expected to be funded in the 2026-27 year
A $28 million research renovation and physical plant relocation — the school will relocate its plant and use the current facility for research — expected to be funded in 2027-28 year

U of M has also already received funding from the State for two other projects. It’s scored $25 million in state funding for the renovation of the Fogelman College of Business and Economics, which will be paired with $5 million in matching funds from U of M — putting the cost at $30 million.

And it’s received $20 million in state funding for the renovation of Mynders Hall — U of M’s first residence hall, built in 1912 — which, like the Fogelman project, will be paired with $5 million in matching funds from the university. This puts the renovation’s cost at $25 million.”

Is there a link to a "new" Masterplan that reflects some of this ? The one I have saved is so old, it shows the Scheidt Music building being built off of Highland, and I've seen it being constructed on Central replacing some of the parking lot there ..

Not that I’ve seen. I imagine it may take 6 months to a year for a complete update. I think there some more pieces that need to be solidified.

Used to be plans were 10 years then 5 years. The capitol campaign will help shape as has the final decision on no OCS.
06-04-2022 10:32 AM
Find all posts by this user Quote this message in a reply
Virginia Tiger Offline
2nd String
*

Posts: 446
Joined: Nov 2019
Reputation: 97
I Root For: Memphis
Location: Washington, DC
Post: #4
RE: Campus space, facilities and funding
Love it! Thanks for the information.
06-04-2022 10:36 AM
Find all posts by this user Quote this message in a reply
NDTiger Offline
All American
*

Posts: 4,126
Joined: May 2009
Reputation: 114
I Root For: Memphis Tigers
Location: Midtown
Post: #5
RE: Campus space, facilities and funding
Is the Stem Building already under construction?
06-04-2022 11:18 AM
Find all posts by this user Quote this message in a reply
griffin Offline
All American
*

Posts: 3,124
Joined: Sep 2004
Reputation: 339
I Root For: Memphis
Location: Germantown, TN
Post: #6
RE: Campus space, facilities and funding
Memphis is currently tasked with a $ 450,000,000 capital campaign in total outside of the stadium major renovation.

What we are seeing would be similar to what happened with the explosion of capex spending in the late 80s and early 90s across many campuses, yet we are a bit behind the eight ball as of right now. We are making huge strides on catching up.

$ 450,000,000
$ 250,000,000

Total $ 700,000,000 has to be raised

This is something to be proud of, twenty years ago - we would not have taken on a $ 100,000,000 campaign.
06-04-2022 11:21 AM
Find all posts by this user Quote this message in a reply
Advertisement


tcountytigerfan Offline
1st String
*

Posts: 1,037
Joined: Nov 2010
Reputation: 142
I Root For: Memphis Tigers
Location:
Post: #7
RE: Campus space, facilities and funding
(06-04-2022 11:21 AM)griffin Wrote:  Memphis is currently tasked with a $ 450,000,000 capital campaign in total outside of the stadium major renovation.

What we are seeing would be similar to what happened with the explosion of capex spending in the late 80s and early 90s across many campuses, yet we are a bit behind the eight ball as of right now. We are making huge strides on catching up.

$ 450,000,000
$ 250,000,000

Total $ 700,000,000 has to be raised

This is something to be proud of, twenty years ago - we would not have taken on a $ 100,000,000 campaign.

So true! U of M has made enormous strides in every faucet over the past 10-20 years. Amazing.
06-04-2022 04:44 PM
Find all posts by this user Quote this message in a reply
tigertaylor Offline
Special Teams
*

Posts: 913
Joined: Mar 2005
Reputation: 57
I Root For: Tigers
Location: Flippin, AR
Post: #8
RE: Campus space, facilities and funding
(06-04-2022 04:44 PM)tcountytigerfan Wrote:  
(06-04-2022 11:21 AM)griffin Wrote:  Memphis is currently tasked with a $ 450,000,000 capital campaign in total outside of the stadium major renovation.

What we are seeing would be similar to what happened with the explosion of capex spending in the late 80s and early 90s across many campuses, yet we are a bit behind the eight ball as of right now. We are making huge strides on catching up.

$ 450,000,000
$ 250,000,000

Total $ 700,000,000 has to be raised

This is something to be proud of, twenty years ago - we would not have taken on a $ 100,000,000 campaign.

So true! U of M has made enormous strides in every faucet over the past 10-20 years. Amazing.
it's been pouring in! COGS
06-04-2022 08:29 PM
Find all posts by this user Quote this message in a reply
Tigerx3 Offline
Hall of Famer
*

Posts: 12,385
Joined: Mar 2004
Reputation: 959
I Root For: Memphis
Location: Germantown
Post: #9
RE: Campus space, facilities and funding
(06-04-2022 10:17 AM)DDrum1961 Wrote:  
(06-04-2022 04:37 AM)Tigerx3 Wrote:  An update on plans for the next 5 years. R-1 research funds, new buildings, expanded research support, state funding, etc. Hardgrave has hit the ground running.


‘The research modernization is just one component of this. U of M is also looking to gain more research funding, and as chief government relations and policy officer Katie VanLandingham noted during the meeting, Governor Bill Lee has proposed that the state give U of M $50 million for a research endowment to maintain R1 status — which U of M would then match dollar-for-dollar, making it a $100 million fund.

And U of M has other capital projects in the works that could support U of M’s R1 efforts, too. During the meeting, chief university planning officer Tony Poteet laid out the school’s five-year capital outlay plan, which, besides the research modernization, includes these facilities:

A $68.41 million interdisciplinary science facility on the main campus, expected to be funded in the 2024-25 year
A $54 million research park — new research facilities west of the main campus — expected to be funded in the 2025-26 year
An $83 million building replacement for Mitchell Hall and Clement Hall, expected to be funded in the 2026-27 year
A $28 million research renovation and physical plant relocation — the school will relocate its plant and use the current facility for research — expected to be funded in 2027-28 year

U of M has also already received funding from the State for two other projects. It’s scored $25 million in state funding for the renovation of the Fogelman College of Business and Economics, which will be paired with $5 million in matching funds from U of M — putting the cost at $30 million.

And it’s received $20 million in state funding for the renovation of Mynders Hall — U of M’s first residence hall, built in 1912 — which, like the Fogelman project, will be paired with $5 million in matching funds from the university. This puts the renovation’s cost at $25 million.”

Is there a link to a "new" Masterplan that reflects some of this ? The one I have saved is so old, it shows the Scheidt Music building being built off of Highland, and I've seen it being constructed on Central replacing some of the parking lot there ..

https://www.memphis.edu/bot/pdfs/march_2...eeting.pdf

This is the link to the 2021 board meeting that includes approval of the $600,000,000 capital campaign that will run into 2026 and a copy of the updated Masterplan.

Both, while substantially still accurate, have been updated as indicated in the OP.
06-05-2022 10:07 AM
Find all posts by this user Quote this message in a reply
tigerengineer Offline
All American
*

Posts: 3,793
Joined: Sep 2005
Reputation: 169
I Root For: The Tigers!
Location:
Post: #10
RE: Campus space, facilities and funding
(06-04-2022 11:18 AM)NDTiger Wrote:  Is the Stem Building already under construction?

No, but it should be in the next few months, inflation has played havoc with getting it under contract
06-05-2022 03:03 PM
Find all posts by this user Quote this message in a reply
tcountytigerfan Offline
1st String
*

Posts: 1,037
Joined: Nov 2010
Reputation: 142
I Root For: Memphis Tigers
Location:
Post: #11
RE: Campus space, facilities and funding
(06-04-2022 08:29 PM)tigertaylor Wrote:  
(06-04-2022 04:44 PM)tcountytigerfan Wrote:  
(06-04-2022 11:21 AM)griffin Wrote:  Memphis is currently tasked with a $ 450,000,000 capital campaign in total outside of the stadium major renovation.

What we are seeing would be similar to what happened with the explosion of capex spending in the late 80s and early 90s across many campuses, yet we are a bit behind the eight ball as of right now. We are making huge strides on catching up.

$ 450,000,000
$ 250,000,000

Total $ 700,000,000 has to be raised

This is something to be proud of, twenty years ago - we would not have taken on a $ 100,000,000 campaign.

So true! U of M has made enormous strides in every faucet over the past 10-20 years. Amazing.
it's been pouring in! COGS

? autocorrect strikes again! Gotta make sure I look back before posting ?
06-05-2022 06:59 PM
Find all posts by this user Quote this message in a reply
Advertisement


TIGERBUDDY Offline
All American
*

Posts: 3,514
Joined: Mar 2004
Reputation: 266
I Root For: MEMPHIS TIGERS
Location: Germantown/Sarasota
Post: #12
RE: Campus space, facilities and funding
(06-04-2022 04:44 PM)tcountytigerfan Wrote:  
(06-04-2022 11:21 AM)griffin Wrote:  Memphis is currently tasked with a $ 450,000,000 capital campaign in total outside of the stadium major renovation.

What we are seeing would be similar to what happened with the explosion of capex spending in the late 80s and early 90s across many campuses, yet we are a bit behind the eight ball as of right now. We are making huge strides on catching up.

$ 450,000,000
$ 250,000,000

Total $ 700,000,000 has to be raised

This is something to be proud of, twenty years ago - we would not have taken on a $ 100,000,000 campaign.

So true! U of M has made enormous strides in every faucet over the past 10-20 years. Amazing.
07-coffee3 Did we use Delta or Mohn faucets in the sinks, etc. LOL
06-06-2022 04:41 AM
Find all posts by this user Quote this message in a reply
Tiger87 Offline
Hall of Famer
*

Posts: 19,130
Joined: Jan 2012
Reputation: 1248
I Root For: Memphis
Location:
Post: #13
RE: Campus space, facilities and funding
(06-06-2022 04:41 AM)TIGERBUDDY Wrote:  
(06-04-2022 04:44 PM)tcountytigerfan Wrote:  
(06-04-2022 11:21 AM)griffin Wrote:  Memphis is currently tasked with a $ 450,000,000 capital campaign in total outside of the stadium major renovation.

What we are seeing would be similar to what happened with the explosion of capex spending in the late 80s and early 90s across many campuses, yet we are a bit behind the eight ball as of right now. We are making huge strides on catching up.

$ 450,000,000
$ 250,000,000

Total $ 700,000,000 has to be raised

This is something to be proud of, twenty years ago - we would not have taken on a $ 100,000,000 campaign.

So true! U of M has made enormous strides in every faucet over the past 10-20 years. Amazing.
07-coffee3 Did we use Delta or Mohn faucets in the sinks, etc. LOL

I hope Delta. They're just right down I-40 in Jackson.
06-06-2022 09:28 AM
Find all posts by this user Quote this message in a reply
NDTiger Offline
All American
*

Posts: 4,126
Joined: May 2009
Reputation: 114
I Root For: Memphis Tigers
Location: Midtown
Post: #14
RE: Campus space, facilities and funding
MemphisRising
https://gotigersgo.com/feature/memphisrising
- Drove by South Campus today. Upgrades to baseball and softball fields look nice.
- Any over update to the “Initial Phase” of this campaign? The 2 biggest pieces 1) Student-Athlete Success Center and 2) State of art Dorms were both support construction this Summer. All the old buildings are still in place. Is there an update on when demo will begin and are both projects on track?? Have heard nothing, since March ‘22

https://gotigersgo.com/news/2022/3/9/gen...enter.aspx
(This post was last modified: 02-11-2023 06:43 PM by NDTiger.)
02-11-2023 06:43 PM
Find all posts by this user Quote this message in a reply
tigerengineer Offline
All American
*

Posts: 3,793
Joined: Sep 2005
Reputation: 169
I Root For: The Tigers!
Location:
Post: #15
RE: Campus space, facilities and funding
STEM building is now under construction and on schedule. Up out of the ground and moving forward.
02-12-2023 03:17 PM
Find all posts by this user Quote this message in a reply
NDTiger Offline
All American
*

Posts: 4,126
Joined: May 2009
Reputation: 114
I Root For: Memphis Tigers
Location: Midtown
Post: #16
RE: Campus space, facilities and funding
(02-12-2023 03:17 PM)tigerengineer Wrote:  STEM building is now under construction and on schedule. Up out of the ground and moving forward.

Understood. My question was about S Campus though.
02-12-2023 09:00 PM
Find all posts by this user Quote this message in a reply
Advertisement


NDTiger Offline
All American
*

Posts: 4,126
Joined: May 2009
Reputation: 114
I Root For: Memphis Tigers
Location: Midtown
Post: #17
RE: Campus space, facilities and funding
Bump

Any news on Memphis Rising Campaign and breaking ground on South Campus?
04-11-2023 08:08 AM
Find all posts by this user Quote this message in a reply
tiger86 Offline
1st String
*

Posts: 1,819
Joined: Mar 2004
Reputation: 119
I Root For:
Location:
Post: #18
RE: Campus space, facilities and funding
(06-04-2022 04:44 PM)tcountytigerfan Wrote:  
(06-04-2022 11:21 AM)griffin Wrote:  Memphis is currently tasked with a $ 450,000,000 capital campaign in total outside of the stadium major renovation.

What we are seeing would be similar to what happened with the explosion of capex spending in the late 80s and early 90s across many campuses, yet we are a bit behind the eight ball as of right now. We are making huge strides on catching up.

$ 450,000,000
$ 250,000,000

Total $ 700,000,000 has to be raised

This is something to be proud of, twenty years ago - we would not have taken on a $ 100,000,000 campaign.

So true! U of M has made enormous strides in every faucet over the past 10-20 years. Amazing.

Not amazing. Coincides with the departure of Shirley Raines and RC Johnson.
04-11-2023 10:16 AM
Find all posts by this user Quote this message in a reply
Keeper Offline
All American
*

Posts: 3,415
Joined: Aug 2017
Reputation: 204
I Root For: Memphis
Location: memphis
Post: #19
RE: Campus space, facilities and funding
(04-11-2023 10:16 AM)tiger86 Wrote:  
(06-04-2022 04:44 PM)tcountytigerfan Wrote:  
(06-04-2022 11:21 AM)griffin Wrote:  Memphis is currently tasked with a $ 450,000,000 capital campaign in total outside of the stadium major renovation.

What we are seeing would be similar to what happened with the explosion of capex spending in the late 80s and early 90s across many campuses, yet we are a bit behind the eight ball as of right now. We are making huge strides on catching up.

$ 450,000,000
$ 250,000,000

Total $ 700,000,000 has to be raised

This is something to be proud of, twenty years ago - we would not have taken on a $ 100,000,000 campaign.

So true! U of M has made enormous strides in every faucet over the past 10-20 years. Amazing.

Not amazing. Coincides with the departure of Shirley Raines and RC Johnson.

The doctor of kiddie lit, and a third tier cola.
04-11-2023 06:31 PM
Find all posts by this user Quote this message in a reply
ncrdbl1 Offline
Legend
*

Posts: 27,208
Joined: Nov 2005
Reputation: 481
I Root For: Memphis Tigers
Location: Horn Lake
Post: #20
RE: Campus space, facilities and funding
(06-06-2022 04:41 AM)TIGERBUDDY Wrote:  
(06-04-2022 04:44 PM)tcountytigerfan Wrote:  
(06-04-2022 11:21 AM)griffin Wrote:  Memphis is currently tasked with a $ 450,000,000 capital campaign in total outside of the stadium major renovation.

What we are seeing would be similar to what happened with the explosion of capex spending in the late 80s and early 90s across many campuses, yet we are a bit behind the eight ball as of right now. We are making huge strides on catching up.

$ 450,000,000
$ 250,000,000

Total $ 700,000,000 has to be raised

This is something to be proud of, twenty years ago - we would not have taken on a $ 100,000,000 campaign.

So true! U of M has made enormous strides in every faucet over the past 10-20 years. Amazing.
07-coffee3 Did we use Delta or Mohn faucets in the sinks, etc. LOL

Kohler
04-12-2023 05:07 AM
Visit this user's website Find all posts by this user Quote this message in a reply
Post Reply 




User(s) browsing this thread: 1 Guest(s)


Copyright © 2002-2024 Collegiate Sports Nation Bulletin Board System (CSNbbs), All Rights Reserved.
CSNbbs is an independent fan site and is in no way affiliated to the NCAA or any of the schools and conferences it represents.
This site monetizes links. FTC Disclosure.
We allow third-party companies to serve ads and/or collect certain anonymous information when you visit our web site. These companies may use non-personally identifiable information (e.g., click stream information, browser type, time and date, subject of advertisements clicked or scrolled over) during your visits to this and other Web sites in order to provide advertisements about goods and services likely to be of greater interest to you. These companies typically use a cookie or third party web beacon to collect this information. To learn more about this behavioral advertising practice or to opt-out of this type of advertising, you can visit http://www.networkadvertising.org.
Powered By MyBB, © 2002-2024 MyBB Group.
MemphisTigers.org is the number one message board for Memphis Tigers sports.