USA Stadium
I have been casually following the stadium proposal at USA. Apparently there is a holdup with the city council, but I think it will ultimately get done.

I have heard some quotes from the AD and mayor that they hope to break ground in July so that it will be ready in 2020.

Does that seem possible? Would they have time for the design phase, bond issue so quickly. I guess we don't know how much of the design work was done before they went public with their intention to build.

I wish our stadium would be ready for 2020, but I don't want us to cut any corners
(maybe that is why their football practice pavilion collapsed during construction).
07-10-2018 01:38 PM
Find all posts by this user Quote this message in a reply
Advertisement


Cole Offline
2nd String
*

Posts: 291
Joined: May 2010
Reputation: 3
I Root For: UAB
Location: Fairhope, AL
Post: #2
RE: USA Stadium
Apparently they have been working on it for the last three years and are ready to put shovel to ground. The admin at USA has said they will build with or without help from city/county. The assumption down here is that no city/county help would delay the stadium. The people associated with the current city stadium are stalling until they figure out if it gets torn down, reduced for just high school football or if they decide they want to keep it as is. They said there will be no student fees used/added to support the stadium. No major donors have been announced yet, though.

It went from little to no talk straight to we want shovels in the ground in July.
07-10-2018 02:21 PM
Find all posts by this user Quote this message in a reply
ATTALLABLAZE Offline
Administrator
*

Posts: 56,918
Joined: Jan 2003
Reputation: 640
I Root For: UAB Blazers
Location: Gallant, Birmingham

The Parliament AwardsCrappiesDonatorsBlazerTalk AwardBlazerTalk AwardBlazerTalk AwardBlazerTalk AwardBlazerTalk AwardCrappies
Post: #3
RE: USA Stadium
For that to happen they would already have to have much of the design completed and / or donandesign / build in which sometimes you are building faster than the architects and engineers which can lead to a lot of going back and re-doing or reworking specific things. I find 20 highly optimistic and wishful.
(This post was last modified: 07-10-2018 02:37 PM by ATTALLABLAZE.)
07-10-2018 02:36 PM
Visit this user's website Find all posts by this user Quote this message in a reply
Advertisement


WesternBlazer Offline
Hall of Famer
*

Posts: 22,158
Joined: Jan 2008
Reputation: 90
I Root For: UAB
Location:
Post: #4
RE: USA Stadium
You think that after the pavillion debacle they would make sure all i's are dotted and t's crossed and slow it down a bit...
07-10-2018 06:49 PM
Find all posts by this user Quote this message in a reply
mixduptransistor Offline
Hall of Famer
*

Posts: 10,983
Joined: Dec 2006
Reputation: 79
I Root For: UAB
Location: Atlanta
Post: #5
RE: USA Stadium
(07-10-2018 02:36 PM)ATTALLABLAZE Wrote:  For that to happen they would already have to have much of the design completed and / or donandesign / build in which sometimes you are building faster than the architects and engineers which can lead to a lot of going back and re-doing or reworking specific things. I find 20 highly optimistic and wishful.

It's amazing how much stuff you can get done ahead of time when the administration is working with instead of against a project
07-10-2018 10:38 PM
Find all posts by this user Quote this message in a reply
Advertisement


Cole Offline
2nd String
*

Posts: 291
Joined: May 2010
Reputation: 3
I Root For: UAB
Location: Fairhope, AL
Post: #6
RE: USA Stadium
USA President on radio this morning. They've begun site work. County ($5mil) deferred until City ($10mil) made a decision. City tabled discussion this week, so now both are in question. Said if City/County said no, then they would have to stop after site work as they would not have funding to continue. Previously been reported that USA would move forward regardless of City/County, but that appears to be false. President said they were still hoping to hit 2020. Starting site work now helps and they have architectural firm picked out and are ready to go, just need funding. Didn't say anything about private donations.
07-12-2018 08:49 AM
Find all posts by this user Quote this message in a reply
ATTALLABLAZE Offline
Administrator
*

Posts: 56,918
Joined: Jan 2003
Reputation: 640
I Root For: UAB Blazers
Location: Gallant, Birmingham

The Parliament AwardsCrappiesDonatorsBlazerTalk AwardBlazerTalk AwardBlazerTalk AwardBlazerTalk AwardBlazerTalk AwardCrappies
Post: #7
RE: USA Stadium
Probably putting in utilities and grading. They don't need a lot for that to begin.
07-12-2018 08:53 AM
Visit this user's website Find all posts by this user Quote this message in a reply
Advertisement


blazer-J Offline
2nd String
*

Posts: 328
Joined: Nov 2007
Reputation: 7
I Root For: UAB
Location:
Post: #8
RE: USA Stadium
(07-12-2018 08:53 AM)ATTALLABLAZE Wrote:  Probably putting in utilities and grading. They don't need a lot for that to begin.

Have they started this at the BJCC yet?
(This post was last modified: 07-12-2018 11:18 AM by blazer-J.)
07-12-2018 11:18 AM
Find all posts by this user Quote this message in a reply
mixduptransistor Offline
Hall of Famer
*

Posts: 10,983
Joined: Dec 2006
Reputation: 79
I Root For: UAB
Location: Atlanta
Post: #9
RE: USA Stadium
(07-12-2018 11:18 AM)blazer-J Wrote:  
(07-12-2018 08:53 AM)ATTALLABLAZE Wrote:  Probably putting in utilities and grading. They don't need a lot for that to begin.

Have they started this at the BJCC yet?

pretty sure they've started moving utilities at the BJCC
07-12-2018 01:13 PM
Find all posts by this user Quote this message in a reply
hooverblazer Offline
Promoter of UAB
*

Posts: 13,777
Joined: Dec 2006
Reputation: 101
I Root For: UAB
Location:
Post: #10
RE: USA Stadium
(07-12-2018 01:13 PM)mixduptransistor Wrote:  
(07-12-2018 11:18 AM)blazer-J Wrote:  
(07-12-2018 08:53 AM)ATTALLABLAZE Wrote:  Probably putting in utilities and grading. They don't need a lot for that to begin.

Have they started this at the BJCC yet?

pretty sure they've started moving utilities at the BJCC

At a booster event about a month ago, Ingram said utility work had started for the stadium.
07-12-2018 02:48 PM
Find all posts by this user Quote this message in a reply
Post Reply 




User(s) browsing this thread: 1 Guest(s)


Copyright © 2002-2024 Collegiate Sports Nation Bulletin Board System (CSNbbs), All Rights Reserved.
CSNbbs is an independent fan site and is in no way affiliated to the NCAA or any of the schools and conferences it represents.
This site monetizes links. FTC Disclosure.
We allow third-party companies to serve ads and/or collect certain anonymous information when you visit our web site. These companies may use non-personally identifiable information (e.g., click stream information, browser type, time and date, subject of advertisements clicked or scrolled over) during your visits to this and other Web sites in order to provide advertisements about goods and services likely to be of greater interest to you. These companies typically use a cookie or third party web beacon to collect this information. To learn more about this behavioral advertising practice or to opt-out of this type of advertising, you can visit http://www.networkadvertising.org.
Powered By MyBB, © 2002-2024 MyBB Group.