CSNbbs

Full Version: Question about hwy 385 (loop 269)
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Is it completed from I 40 all the way to 57 now? Google maps says it is, but all other maps say no.
(05-01-2014 08:05 AM)BIGDTiger Wrote: [ -> ]Is it completed from I 40 all the way to 57 now? Google maps says it is, but all other maps say no.

you can get on 385 at hwy 51 in Millington and drive past hwy 14, I40, macon rd, hwy 57, hwy 72, all the way to the 385 & 240 junction.


between 57 and 72 there is a lot of construction on a new interchange going south only.
(05-01-2014 08:10 AM)BinghamptonNed Wrote: [ -> ]
(05-01-2014 08:05 AM)BIGDTiger Wrote: [ -> ]Is it completed from I 40 all the way to 57 now? Google maps says it is, but all other maps say no.

you can get on 385 at hwy 51 in Millington and drive past hwy 14, I40, macon rd, hwy 57, hwy 72, all the way to the 385 & 240 junction.


between 57 and 72 there is a lot of construction on a new interchange going south only.

on a new interchange going south only......

that is the 269 in mississippi, it will head south over 302, curve west and go over 78 and run parallel to 304 to connect into the piece already completed in hernando/i55

it will make a faster connect into tunica
Reference URL's