OT - Bridge Replacements
Up on the state wide BX/Ohio bidding system this morning:

City of Toledo is taking bids on replacing the Bancroft Street bridge over the Ottawa River (next to the 7-Eleven and old Stein n Pitcher), and the Secor Road bridge over the Ottawa River (west campus entrance next the Law Center).

First report was today and does not mention start or completion dates.......
06-07-2016 08:14 AM
Find all posts by this user Quote this message in a reply
Advertisement


Stpetebeachrocketfan Offline
1st String
*

Posts: 1,147
Joined: Mar 2012
Reputation: 7
I Root For: Toledo
Location:
Post: #2
RE: OT - Bridge Replacements
(06-07-2016 08:14 AM)Terry Wrote:  Up on the state wide BX/Ohio bidding system this morning:

City of Toledo is taking bids on replacing the Bancroft Street bridge over the Ottawa River (next to the 7-Eleven and old Stein n Pitcher), and the Secor Road bridge over the Ottawa River (west campus entrance next the Law Center).

First report was today and does not mention start or completion dates.......

Anyone got any updates on the new bridge going in on main campus right now?
06-07-2016 10:12 AM
Find all posts by this user Quote this message in a reply
indianasniff Offline
All American
*

Posts: 3,847
Joined: Dec 2012
Reputation: 29
I Root For: Toledo
Location:
Post: #3
OT - Bridge Replacements
[Image: a30ffbd5aad2004fe0f5b6fe5f3e459d.jpg]

Took a bridge pic Sunday too. Orange Barrels are my friends. Civil Engineer humor


Sent from my iPhone using Tapatalk
06-07-2016 01:25 PM
Find all posts by this user Quote this message in a reply
Advertisement


Stpetebeachrocketfan Offline
1st String
*

Posts: 1,147
Joined: Mar 2012
Reputation: 7
I Root For: Toledo
Location:
Post: #4
RE: OT - Bridge Replacements
(06-07-2016 01:25 PM)indianasniff Wrote:  [Image: a30ffbd5aad2004fe0f5b6fe5f3e459d.jpg]

Took a bridge pic Sunday too. Orange Barrels are my friends. Civil Engineer humor


Sent from my iPhone using Tapatalk

There is a lot of stuff going on at the main campus these days? I also read a story that the library is undergoing a $6M renovation in two phases and that walls will be cut open to add large windows for some of the study floors.
06-07-2016 03:10 PM
Find all posts by this user Quote this message in a reply
eastisbest Offline
Hall of Famer
*

Posts: 14,589
Joined: Aug 2008
Reputation: 42
I Root For: Toledo
Location:
Post: #5
RE: OT - Bridge Replacements
The last library renovation is a terrific work. Extremely inviting atmosphere and reflects the change in study needs and styles from books to computers. I guess the new one is to continue that work. Still, I miss those old wood shelves, tables, chairs and real books. Not many consider keeping at least one room old-fashioned.

New campus bridge: lucky there hasn't been bunches of run-overs on that old narrow bridge. Look forward to being able to cross the OR without stepping into the street.
06-08-2016 07:40 AM
Find all posts by this user Quote this message in a reply
Stpetebeachrocketfan Offline
1st String
*

Posts: 1,147
Joined: Mar 2012
Reputation: 7
I Root For: Toledo
Location:
Post: #6
RE: OT - Bridge Replacements
(06-08-2016 07:40 AM)eastisbest Wrote:  The last library renovation is a terrific work. Extremely inviting atmosphere and reflects the change in study needs and styles from books to computers. I guess the new one is to continue that work. Still, I miss those old wood shelves, tables, chairs and real books. Not many consider keeping at least one room old-fashioned.

New campus bridge: lucky there hasn't been bunches of run-overs on that old narrow bridge. Look forward to being able to cross the OR without stepping into the street.

In regards the the library, I read that the current library renovation ecompases making two more floors very modern and inviting. Then later in the year they will start on another phase that may include cutting holes into the outside walls to add large windows for natural light.

I regards to the new bridge, I saw the renderings and the columns are going to be stone with lights on top with very wide sidewalks. I believe the entire thing was designed by UT engineering students? It should look great!
(This post was last modified: 06-08-2016 05:05 PM by Stpetebeachrocketfan.)
06-08-2016 08:13 AM
Find all posts by this user Quote this message in a reply
Post Reply 




User(s) browsing this thread: 1 Guest(s)


Copyright © 2002-2024 Collegiate Sports Nation Bulletin Board System (CSNbbs), All Rights Reserved.
CSNbbs is an independent fan site and is in no way affiliated to the NCAA or any of the schools and conferences it represents.
This site monetizes links. FTC Disclosure.
We allow third-party companies to serve ads and/or collect certain anonymous information when you visit our web site. These companies may use non-personally identifiable information (e.g., click stream information, browser type, time and date, subject of advertisements clicked or scrolled over) during your visits to this and other Web sites in order to provide advertisements about goods and services likely to be of greater interest to you. These companies typically use a cookie or third party web beacon to collect this information. To learn more about this behavioral advertising practice or to opt-out of this type of advertising, you can visit http://www.networkadvertising.org.
Powered By MyBB, © 2002-2024 MyBB Group.